18
d
32
L
L
R
L
L
L
20
32
5,5
52
2.1 Picture of BLUE MAX mini, type 2/6
2.2 General information on installation
and connection
The BLUE MAX mini 2/6 is packed and delivered in cardboard boxes.
Some parts and components need to be assembled in order to render
the machine ready for operation. Once assembled, any dust having
accumulated during transit and preservatives (oil) must be cleaned
off the machine.
2.2.1 BLUE MAX mini base frame
Slide work top with collar screws onto the base profile and fix fence
angle guide to the base profile by means of clamping blocks and
machine screws.
2.2.2 Chucks
When delivered, the machine is already equipped with standard
chucks. Chucks not required must be closed off with the six caps pro-
vided so as to prevent the grub screws from working loose and also to
ensure effective protection from soiling.
2.0 Installation and connection
g
Summary of Contents for BlueMax Mini 2
Page 2: ......
Page 13: ...d 13 7 2 Explosionszeichnungen...
Page 25: ...25 d 7 2 Exploded drawing g...
Page 37: ...37 d 7 2 Sch ma en clat f...
Page 49: ...49 d 7 2 Plano de despiece detallado e...
Page 61: ...61 d 7 2 Desenhos das pe as de reposi o p...
Page 65: ...65 d r H 1 2 3 I 1 2 3 J 1 2 3 4 K 1 2 3 4 5 6 7 8 9 10 L 1 M 1 2 N O 1 P 1 Q R 1 2 3 4...
Page 67: ...67 d r 67 2 2 3 57 10 SW 2 5 2 3 2 3 1 8 2 2 4 2 4 1 020 485 1 2 2 4 2 020 486 1 2...
Page 68: ...68 d r 68 3 1 1 3 2 3 3 0 4 0 4 1 BLUE MAX mini 2 6 3 0 4 0...
Page 73: ...73 d 73 7 2 r...
Page 85: ...85 d 7 2 Explosieftekeningen n...
Page 97: ...d 97 P 7 2 Rysunki eksplozyjne...
Page 99: ......