20
These two cladding stones (F) are
interchangeable.
Once the cladding stones (E) have been instal-
led, install the top front stones (F). Follow the
same procedure as for the other cladding sto-
nes, except that the distance from the top of the
cladding stones to the mounting pegs is 55 mm.
These two brackets may need to be adju-
sted up or down to adjust the height of the
soapstone/ceramic panels.
This can be done using pliers or a hammer.
The soapstone/ceramic panels may need to be
adjusted to be level with the cladding stones
on the sides of the stove. Do this by loosening
the four screws, two on each side. (use a 4 mm
hex key)
Start by loosening the bottom two screws while
the cladding is attached. Push the cladding in
or out as required. Do the same with the top
two screws.
There are two screws
on each side for adju-
sting the front stone.
These two brackets may need to be adju-
sted up or down to adjust the height of the
soapstone/ceramic panels in relation to the
door.
This can be done using pliers or a hammer.
4 mm
When adjusting the cladding under the door,
it must be min. 4 mm air between door and
cladding.
scan-line 80 Xl
Summary of Contents for SCAN-LIINE 80 XL
Page 18: ...18 scan line 80 Xl and scan line 80 XlB ...
Page 28: ...28 ...