17
scan-line 80 XlB
Remove the air adjustment lever before
installing the cladding.
(10 mm spanner)
Start installing the cladding at the bottom rear
section of the stove.
The first cladding stone (C or D) has a hole for
outside air connection.
Attach the cladding stone to the casing and
insert the mounting pegs (47 mm from the top
of the cladding stone) in the large circular holes
in the keyholes, close to the side panel. Let the
stone slide down so the pegs are at the bottom
of the keyholes.
These two brackets may need to be adjusted
up or down to adjust the height of the soapsto-
ne/ceramic panels in relation to the door.
This can be done using
pliers or a hammer.
Stoves are shipped from the factory with a 1
mm gap between the side plates.
This gap can be adjusted using screws
(6 pieces) to match the space between
cladding panels C and D.
Summary of Contents for SCAN-LIINE 80 XL
Page 18: ...18 scan line 80 Xl and scan line 80 XlB ...
Page 28: ...28 ...