9
T-CONTROL
30
9.11
Module configuration
Boiler
Buffer
Hot water tank
Overview
Status
Settings
Operating hours
Inputs/Outputs
General settings
Overview
Status
Settings
Agg-Test
Barrier times
Overview
Status
Settings
Agg-Test
Circulation pump
Time program/Barrier times
Heating circuit
Time mode
Solar
Overview
Status
Operation modes
Settings
Agg-Test
Heating circuit curve
Time program / Barrier times
Overview
Time program
Settings
Overview
Status
Settings
Agg-Test
Yield
Hydraulic compensator
Net pump
Zone valve
Overview
Status
Agg-Test
Barrier times
Overview
Status
Agg-Test
Barrier times
Overview
Status
Agg-Test
Barrier times
Ext. requirement
Additional boiler
Overview
Status
Settings
Barrier times
Heat curve
Overview
Status
Settings
Agg-Test
Barrier times
9.12
Terms and definitions
In this chapter all parameters and terms of the different modules are explained.
Some terms can be a display value and a setting value. To recognize these, they are
marked with a *.
◼
The term is a display value if aggregate test is inactive
→
the symbol of the
aggregate test is:
◼
If the aggregate test is active (by pressing the symbol
the hand will change to
green and the aggregate test gets activated) the individual components can be tested
by pressing the control lamp. Now the term is a so-called setting value.
Summary of Contents for firematic PELLET 120
Page 1: ...OPERATING INSTRUCTIONS Wood chips pellets heating system firematic PELLET 120 201 ...
Page 84: ...15 Annex 84 15 ANNEX 15 1 Additional boiler module Hydraulic recommendation 1 ...
Page 85: ...Annex 15 85 Hydraulic recommendation 2 ...
Page 86: ...15 Annex 86 15 2 Solar module Program 1 ...
Page 87: ...Annex 15 87 Program 2 ...
Page 88: ...15 Annex 88 Program 3 ...
Page 89: ...Annex 15 89 Program 4 ...
Page 90: ...15 Annex 90 Program 5 ...
Page 91: ...Annex 15 91 Program 6 ...
Page 92: ...16 Notes 92 16 NOTES ...
Page 93: ...Notes 16 93 ...