I
NSTALLATION AND
A
SSEMBLY
19
No.
Diagram
Description
Material requirements
6
•
Run in cantilever 2
1x
Cantilever
7
•
Run lifting platform in
the upper end position.
(Operator control
module: Open stopcock
/ hand-operated lever in
the switch position „on“).
8
•
Screw together
cantilever with the
platform main body.
•
Mount the carriageways
6x
Hexagon screw M12x40
6x
Nut M12
12x
Ring washer 13mm
2x
carriageways
Important:
Insert screws from inside!
9
•
Install roll-off protection /
stop side
(Notice running
direction).
2x
Plate roll-off protection
4x
Hexagon screw M10x30
4x
Nut M10
8x
Ring washer 10.5mm
10
•
Ramps holder /
running side.
(Notice running
direction).
•
Mount drive on ramps.
2x
Plate roll-off protection
4x
Hexagon screw M10x30
4x
Nut M10
8x
Ring washer 10.5mm
2x
Drive on ramps
Summary of Contents for HLS 1200-13
Page 2: ...2...
Page 36: ...ADDITIONAL INFORMATION 36 Proposal 1...
Page 37: ...ADDITIONAL INFORMATION 37 Proposal 2...