4 Operation
CPM 500 Electronic Peak Pressure Indicator
11
4.6 Change battery
Note: Please only use re-chargeable battery E-block type “ANSMANN 250 mAh NiMH”
For changing the re-chargeable battery the battery cover on the back side of CPM 500 must be opened
(fig.9,10,11). Do not change battery during charging process while CPM 500 is connect via USB cable to PC.
Fig.8: Battery cover
Fig.9: Re-chargeable E-block battery type:Ansmann
Fig.10: Battery installed on backside of CPM 500
Note:
If battery of standard NiMh 250 mAh type Ansmann can not be charged or is not available, then the
operator can use for measurements Alkaline battery 9V only for a short time.
In this case please immediately
disconnect the CPM 500 unit after transferring data to PC !
4.7 Mounting instructions on marine engines
Measuring at the indicator valve
Before mounting the adapter, please clean the indicator valve by opening (1-2s).
To avoid measurement distortion:
Check adaptor and sensor periodically for dirtiness and clean it if necessary.
+ Pol
The battery should only be installed by
correct pole of battery !
DANGER!
The indicator valve ejects hot gas under high
pressure. Danger of sparks and burning.
Hot gases and particles may be ejected.
Wear gloves and safety glasses!
- Pol