Heatrae Sadia Multipoint 30H Fitting Instructions Manual Download Page 8

8

WARNING

Failure to provide adequate pressure relief 

will invalidate any warranty and lead to a 

dangerous installation.

Discharge 

 

`

It is a requirement of Building Regulation G3 

that any discharge from an unvented system is 

conveyed to where it is visible, but will not cause 

danger to persons in or about the building. 

The tundish and discharge pipes should be 

fitted in accordance with the requirements and 

guidance notes of Building Regulation G3. The 

G3 Requirements and Guidance section 3.50 - 

3.63 are reproduced in the following sections of 

this manual. For discharge pipe arrangements 

not covered by G3 Guidance advice should be 

sought from your local Building Control Officer. 

Any discharge pipe connected to the pressure 

relief devices (expansion valve and temperature/

pressure relief valve) must be installed in a 

continuously downward direction and in a frost 

free environment.

 

`

Water may drip from the discharge pipe of the 

pressure relief device. This pipe must be left 

open to the atmosphere. The pressure relief 

device is to be operated regularly to remove lime 

deposits and to verify that it is not blocked.

G3 Requirement

“...there shall be precautions...to ensure that the 

hot water discharged from safety devices is safely 

conveyed to where it is visible but will not cause 

danger to persons in or about the building.”

The following extract is taken from the latest G3 

Regulations

Discharge pipes from safety devices

Discharge pipe D1

 

`

3.50 – Each of the temperature relief valves 

or combined temperature and pressure relief 

valves specified in 3.13 or 3.17 should discharge 

either directly or by way of a manifold via a short 

length of metal pipe (D1) to a tundish.

 

`

3.51 – The diameter of discharge pipe (D1) 

should be not less than the nominal outlet size 

of the temperature relief valve.

 

`

3.52 – Where a manifold is used it should be 

sized to accept and discharge the total discharge 

from the discharge pipes connected to it.

 

`

3.53 – Where valves other than the temperature 

and pressure relief valve from a single unvented 

hot water system discharge by way of the same 

manifold that is used by the safety devices, the 

manifold should be factory fitted as part of the 

hot water storage system unit or package.

6.  Installation

6.1 General

After reading the previous sections in this booklet 

and choosing a good location for the product please 

install, paying attention to the following hydraulic, 

electrical and commissioning sections.

6.2 Water connections

WARNING

 

`

Under no circumstances should 

the  factory  fitted  temperature/

pressure relief valve be removed 

other than a competent person. To 

do so will invalidate any warranty 

or claim.

 

`

No control or safety valve should 

be tampered with or used for any 

other purpose.

 

`

The discharge pipe should not 

be blocked or used for any other 

purpose.

 

`

The tundish should not be 

located adjacent to any electrical 

components.

Refer  to  the  Installation  schematic  (figure  4,  page 

6) to determine which valves and accessories are 

required. 

Plumb in the valves in the sequence shown in the 

relevant figures 4, page 6. 

 

`

The water connections are 15mm diameter 

copper  tubes  suitable  for  compression  fittings. 

Do not use solder joints as this will damage 

the heater and may prevent servicing under 

warranty.

 

`

The INLET is marked BLUE, the OUTLET is 

marked RED. The WRAS listed isolating valve 

(supplied) must be fitted on the cold water supply 

to the product. Several hot outlets can be served. 

 

`

A drain valve must be fitted below the heater in 

the inlet pipework. It must be sited between the 

heater and the check valve (see figure 4 page 6).

 

`

Plumbers Paste must not be used as it can 

impair the operation of the valves.

 

`

The  product  MUST  be  fitted  with  a  Pressure 

Relief  Valve.  The  factory  fitted  Temperature/

Pressure Relief Valve can fulfill this function.

Summary of Contents for Multipoint 30H

Page 1: ...Multipoint Horizontal 30 and 50 litre Fitting Instructions...

Page 2: ...ise warranty details to customers Contents 1 Introduction 3 1 1 General 3 1 2 Symbols used 3 1 3 Abbreviations 3 1 4 Liabilities 3 2 Safety 4 2 1 General safety warnings 4 2 2 Recommendations 4 2 3 Sp...

Page 3: ...in product quality All the specifications stated in this document are therefore subject to change without notice Our liability as the manufacturer may not be invoked in the following cases Failure to...

Page 4: ...pass the thermal cut out in any circumstance 2 Safety 2 1 General safety warnings DANGER This product is unvented and as such becomes pressurised when in operation The combination of pressurisation an...

Page 5: ...posed of at end of life See Section 3 to 11 Electrical rating 3kW 240V 2 75kW 230V Capacities 30 or 50 litres Weight full 30 litre 42 5kg 50 litre 69 3kg Rated pressure 0 6MPa 6 bar Minimum recommende...

Page 6: ...per inner vessel which ensures an excellent standard of corrosion resistance The outer casing is a combination of resilient thermoplastic moldings and painted steel The product is supplied complete wi...

Page 7: ...iling and national regulations as listed below Building Regulations The Building Standards Scotland The Building Regulations Northern Ireland I E E Electrical Regs UK Water Regulations 5 2 Installatio...

Page 8: ...f valve 3 52 Where a manifold is used it should be sized to accept and discharge the total discharge from the discharge pipes connected to it 3 53 Where valves other than the temperature and pressure...

Page 9: ...ithstanding high temperature discharges of water and 3m from any plastic guttering system that would collect such discharges Tundish 3 54 The tundish should be vertical located in the same space as th...

Page 10: ...esistance of 4 No 28mm elbows at 1 0m each 4 0m Therefore the maximum permitted length equates to 14m As the actual length is 7m a 28mm D2 copper pipe will be satisfactory Safety device e g temperatur...

Page 11: ...he electrical supply The indicator light will illuminate during heating When the set temperature is reached the indicator light will go out The set temperature can be adjusted by rotating the knob loc...

Page 12: ...his pipe must be left open to atmosphere 8 Operation 8 1 General WARNING Do not block or restrict the discharge from any safety valve fitted Do not tamper with any safety valve fitted If water dischar...

Page 13: ...ure water flows freely from the valve s and through the discharge pipes Ensure the valve s reseat correctly when released The Expansion Vessel should have a precharge pressure of 0 35 MPa 3 5 bar This...

Page 14: ...relief valve intermittently A Expansion in mains not possible A Fit pack U2 see important installation points B Mains pressure exceeds 0 41 MPa 4 1 bar B Fit packs U1 and U2 C Pack U1 fitted without p...

Page 15: ...duct can therefore be disposed of through commercial non WEEE waste facilities Heatrae Sadia does not accept any liability under the WEEE directive This product is manufactured from many recyclable ma...

Page 16: ...hin 60 days of installation the user completes and returns the certificate supplied along with proof of purchase to register the product The product is not covered against damage by frost and the imme...

Page 17: ...17...

Page 18: ...18...

Page 19: ...19...

Page 20: ...m our website To support our corporate responsibility and sustainability charters and reduce our printed material we encourage you to download product brochures from our website In designing these fil...

Reviews: