6: Installation - Commissioning

6.1 Filling The Megalife Solar With Water

•  Ensure that all fittings and immersion heater(s) are correctly fitted and tightened. 
•  Open the highest hot tap in the system. 
•  Open the mains cold water supply to the cold water feed cistern. 
•  Open the service valve or stop valve fitted in the cold feed pipe to the unit. Allow the unit to fill. When water 

 

flows from the hot tap allow to run for a few minutes to flush through any dirt or swarf, then close tap. 

•  Allow cold water feed cistern to fill to the water line. Adjust the float valve if necessary. 
•  Open successive hot taps to purge any air from the system. 
•  Check all connections for leaks and rectify as necessary. 

DO NOT SWITCH ON ANY OF THE HEAT SOURCES UNTIL THE UNIT HAS BEEN FULLY FILLED WITH WATER.

6.2 Solar Primary Circuit

Fill the solar primary circuit following the instructions provided with the solar hydraulic controls. The cylinder 
temperature control sensor probe supplied with the solar differential temperature controller must be inserted into 
the pocket in the lower controls housing and its cable securely clamped.

Heating by the solar primary circuit is controlled by the solar differential temperature controller, refer to the 
manufacturers installation instructions for details of how to set up and commission the solar primary circuit. The solar 
controller should be programmed to give a maximum storage temperature in the Megalife solar of 70

o

C although 

60

o

C is recommended to minimise scaling.

6.3 Auxillary Heating Coil Units

Fill the auxillary primary (indirect) circuit following the boiler manufacturer’s commissioning instructions. To ensure 
the primary heating coil in the Megalife solar is filled any motorised valve fitted to control the primary flow to the 
Megalife solar auxillary primary heating coil should be manually opened by moving the lever on the motor housing 
to the MAN OPEN setting. When the primary circuit is full return the lever to the AUTO position. Vent any air by 
opening the air bleed.

When the system is full switch on the boiler, ensure the programmer is set to Domestic Hot Water. Allow the Megalife 
solar unit to heat up and check that the indirect thermostat and any motorised valve connected operate correctly. 
A storage temperature of approx. 60

o

C is recommended.  

36005941_issue_07.indd   11

07/09/2017   08:40:36

Summary of Contents for Megalife CLV190

Page 1: ...Megalife Solar Vented Cistern Fed Water Heater Installation manual SOLAR DIRECT 36005941_issue_07 indd 1 07 09 2017 08 40 29...

Page 2: ...tlet that is arranged to discharge over the cold water feed cistern The Megalife solar water heaters are supplied with a dedicated solar coil in the lower part of the cylinder which must be connected...

Page 3: ...hot water from the safety devices to an appropriate place open to atmosphere where it will cause no danger to persons in or about the building Vented hot water storage systems 3 12 Vented hot water s...

Page 4: ...ously Water Byelaw 30 A vent pipe MUST be connected to the outlet of the heater This must rise continuously and be arranged to discharge into the feed cistern The vent pipe must have a minimum bore di...

Page 5: ...lly the pipework from the heater to the outlet fittings should be in 22mm pipe with short runs of 15mm pipe to the terminal fittings Pipe sizes may vary due to system design 3 5 Vent Pipe A vent pipe...

Page 6: ...UTLET VENT HOT COLD HOT COLD HOT INLET WATER SUPPLY CISTERN TANK COLD MAINS SUPPLY MAX HEAD 40m VENT PIPE Stop Valve OVERFLOW PIPE Fig 03 Typical Vented Solar Installation Schematic 36005941_issue_07...

Page 7: ...ure controller will control the operation of the solar pumped primary circuit to transfer heat from the solar collector panels to the cylinder via the lower solar primary coil heat exchanger refer to...

Page 8: ...y doubt contact a competent electrician 5 3 Wiring All electrical wiring should be carried out by a competent electrician and be in accordance with the latest I E E Wiring Regulations The Megalife sol...

Page 9: ...ns 1 5mm2 3 Core HOFR sheathed cable Indirect control wiring SPINDLE POSITIONS MINIMUM TEMP 10 C MAXIMUM TEMP 72 C APPROX 60 C ROTATE SPINDLE CLOCKWISE FOR TEMPERATURE INCREASE AND COUNTER CLOCKWISE F...

Page 10: ...Supply 1 2 3 G 1 Br Bl 2 0 GY 3 G 1 Br Bl 2 0 1 3 2 2 L N Programmer Boiler Pump Zone valve HTG Cylinder terminal block Room stat Zone valve DHW Junction box 3 2 3 L 1 N 2 3 HTG ON DHW ON L N 2 3 1 L...

Page 11: ...controls housing and its cable securely clamped Heating by the solar primary circuit is controlled by the solar differential temperature controller refer to the manufacturers installation instructions...

Page 12: ...upply The temperature adjustment is made by inserting a flat bladed screwdriver in the slot in the spindle on top of the thermostat and rotating see Fig 05 page 9 If in any doubt consult a competent e...

Page 13: ...laries by carefully pulling outwards from the immersion heater Note which order they are fitted Remove the terminal shroud Unscrew immersion heater backnut s and remove immersion heater from the unit...

Page 14: ...model installed and ensure the correct part is ordered 9 Fault Finding and Servicing 2 9 6 4 5 8 3 1 Fig 08 Spares 10 Item Description Part Number 1 Immersion heater lower 95 606 984 2 Immersion heate...

Page 15: ...low gradu ally decreases 1 Outlet flow rate exceeds inlet flow to cold water feed cistern 2 Flow starvation caused by opening further outlets 1 Install higher flow float valve Consider larger cold wat...

Page 16: ...min at 80 C 2 C Temperature rise is from 15 C to 60 C Indirect units tested to BS EN 12897 2006 Type Model Reference Dimensions mm Solar Auxiliary Coil Solar Surface Area sq m Solar Coil Rating kW Rat...

Page 17: ...per day kWh 24h per year kWh 365d 190 1 52 555 210 1 70 621 250 1 98 723 300 2 31 843 Indirect Model s CLV190 CLV210 CLV250 CLV300 Energy efficiency class C C C C Storage volume V in litres 190 210 2...

Page 18: ...ckness 50mm Immersion heater Alloy sheathed element and thermostat pocket in Duplex stainless steel plate Pipe connections All connections accept 22mm outside diameter pipe compression nuts and olives...

Page 19: ...e Republic of Ireland For installations outside these territories please contact either the Heatrae Sadia Heating Export Department Tel 44 1603 420191 or Baxi International Tel 44 1926 478323 for furt...

Page 20: ...acles Harlow Essex CM19 5BT T 0845 055 3811 E sales ewh co uk SPD Units 9 10 Hexagon Business Centre Springfield Road Hayes Middlesex UB4 0TY T 020 8606 3567 Parts Center T 0845 270 9800 W www partsce...

Reviews: