
17
Heatilator • NEVO3630I-B, NEVO4236I-B Installation Manual • 2378-980 Rev. E • 4/16
Figure 4.10 DVP-SLP24 Adapter
Top Vent - Horizontal Termination - (continued)
H
1
= 11 ft.
max.
V
1
= 2 ft.
DVP PIPE
HORIZONTAL EXAMPLE
(IDENTICAL VENT RUNS USING DVP AND SLP PIPE)
H
1
= 11 ft.
max.
DVP-SLP24
SLP PIPE
V
1
= 2 ft.
2 ft. SLP
DVP-2SL
AND
OR
DVP-SLP24
Adapter
12 ft (3.66 m) min.
60 ft (18.29 m) max.
12 ft (3.66 m) min.
60 ft (18.29 m) max.
DVP
SLP
VERTICAL EXAMPLE
(IDENTICAL VENT RUNS USING DVP AND SLP PIPE)
2 ft. SLP
DVP-2SL
AND
OR
Note: The Nevo series appliances can adapt to SLP series
vent pipe when venting off the top of the appliance. You
must use a DVP-SLP24 adapter or a DVP-2SL and two feet
of DVP pipe which can only be attached to the appliance
starting collar.
On horizontal terminations, the adapter is not counted as
part of the minimum vertical (V1 min.) requirements.
On both horizontal and vertical terminations, the adapter is
counted as part of the maximum vertical limitations.
All venting rules for the vent run must still be followed.
Top Vent - Horizontal Termination
Top Vent—Horizontal Termination—Two 45º Elbows
Installation requirements to replace the
fi
rst 90º elbow
with two 45º elbows:
4 ft min.
(1.22 m)
20 ft max.
(6.10 m)
:
$
/
/
Figure 4.9 Minimum Installation Requirements for Two 45 Degree
Elbows - Top Vent - Horizontal Termination