STP SERIES Install, Operation, and Maintenance Manual
SECTION 2: INSTALLATION INSTRUCTIONS
Page
10
of
97
Diversified Heat Transfer, Inc.
•
439 Main Road
•
Towaco, New Jersey 07082
Rev-1
09/11/2019 PHONE: 800-221-1522
•
WEBSITE: www.dhtnet.com
STP Manual
SECTION 2: INSTALLATION INSTRUCTIONS
CAUTION!
In order to maintain the warranty on the STP Series water heater, the startup must be completed
within six (6) months of shipment, and the start-up report must be furnished to DHT within thirty
(30) days of the startup. The warranty may be found in Section 7, and the Startup and
Installation forms can be found in Section 6.5.
WARNING!
•
INSTALLER MUST COMPLY WITH STARTUP AND INSTALLATION INSTRUCTIONS TO
AVOID A DANGEROUS SITUATION.
•
Startup and installation forms MUST be submitted to a DHT representative or risk loss of
coverage under warranty.
•
The inspection log must be maintained and up-to-date and kept in close proximity to the STP
Series unit for inspection of DHT personnel.
NOTE:
The startup must be performed by DHT factory personnel or a factory authorized
representative.
2.1 RECEIVING, HANDLING, AND STORAGE
STP Series water heater base frame is designed in such a way that unit can be carried from
both sides using forklifts or pallet jacks provided proper care must be taken to prevent any
damages to the unit and its components. Lifting lugs are also available on top of the tank. The
unit must be properly supported over the forks, as indicated by the arrows in Figure 2-1.
FIGURE 2-1: Support Slots for Transport
TRANSPORT UNIT USING
BOTH SUPPORT SLOTS
LIFTING LUGS