![Heat Transfer MODCON VWH 300 HL Installation & Maintenance Download Page 42](http://html.mh-extra.com/html/heat-transfer/modcon-vwh-300-hl/modcon-vwh-300-hl_installation-and-maintenance_2115975042.webp)
PART 7: GAS PIPING
(CONTINUED)
E. DUNGS GAS VALVE
THIS SCREW WITHOUT A COMBUSTION
GAS OUTLET
VALVE
GAS SHUT-OFF
OFFSET ADJUSMENT
GAS OUTLET
CAUTION: DO NOT REMOVE THIS SCREW
PRESSURE TAP
ANALYZER
OR ATTEMPT TO MAKE ANY ADJUSTMENT TO
PRESSURE TAP
GAS INLET
GAS VALVE
GAS INLET
A
SCALE 2 : 3
DETAIL A
THROTTLE ADJUSTER
NOTE: IF FOR ANY REASON THE THROTTLE
NEEDS TO BE ADJUSTED, IT IS VERY IMPORTANT
THAT A "COMBUSTION ANALYZER" BE USED TO
ENSURE SAFE AND PROPER OPERATION.
TURN THE ADJUSTER TO THE (+) TO INCREASE
THE GAS OR (-) TO DECREASE THE GAS SUPPLY.
THIS ADJUSTMENT COULD AFFECT CO/CO%
LEVELS. MAKE SURE THE LEVELS CORRESPOND
TO THE CHART IN COMBUSTION SETTINGS.
(FIG. 10-1)
Fig. 7-2
LP-205-AA Rev. 6/3/08
MOD CON 300 GAS VALVE
tor is used, it must be a minimum of 10 feet from
the Mod Con. It is very important that the gas
line is properly purged by the gas supplier or
utility. Failure to properly purge the lines or
improper line sizing, will result in ignition fail-
ure.
This problem is especially noticeable in
NEW LP installations and also in empty tank sit-
uations. This can also occur when a utility com-
pany shuts off service to an area to provide
maintenance to their lines. This gas valve must
not be replaced with a conventional gas valve
under any circumstances.
GAS-FIRED HOT WATER SUPPLY BOILER
Boiler Manual
41
Summary of Contents for MODCON VWH 300 HL
Page 23: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 22 ...
Page 24: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 23 ...
Page 25: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 24 ...
Page 26: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 25 ...
Page 28: ...27 GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual PART 5 BOILER PIPING CONTINUED ...
Page 75: ...LP 172 REV 2 16 06 74 ...
Page 76: ...LP 172 REV 2 16 06 75 ...
Page 77: ...MAINTENANCE NOTES 76 ...
Page 78: ...MAINTENANCE NOTES 77 ...
Page 79: ...MAINTENANCE NOTES 78 ...
Page 80: ... 2003 2009 Heat Transfer Products Inc www HTproducts com LP 276 REV 11 25 09 ...