![Heat Transfer MODCON VWH 300 HL Installation & Maintenance Download Page 34](http://html.mh-extra.com/html/heat-transfer/modcon-vwh-300-hl/modcon-vwh-300-hl_installation-and-maintenance_2115975034.webp)
Location of exit terminals of mechanical draft and direct-vent venting systems.
(Reference: National Fuel Gas Code ANSI Z223.1/NFPA 54 2002).
Fig. 6-4
Multiple Vent Spacing*
*Note: Exhaust must extend out 1 foot. There should be no more than 2 vents and 2 intakes then a space of 36” to the
next set of vents.
*Note: There must be a minimum of 36” spacing between every 2 kit grouping.
Multiple “V” Series Vents
Fig. 6-5
Multiple Stainless Steel Horizontal Vent Kit Installation – Front View
Fig. 6-3 Multiple Vents
PART 6: VENTING, COMBUSTION AIR & CONDENSATE REMOVAL
(CONTINUED)
GAS-FIRED HOT WATER SUPPLY BOILER
Boiler Manual
33
Fig. 6-6
Multiple Concentric Vent
Spacing – Vertical
Summary of Contents for MODCON VWH 300 HL
Page 23: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 22 ...
Page 24: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 23 ...
Page 25: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 24 ...
Page 26: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 25 ...
Page 28: ...27 GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual PART 5 BOILER PIPING CONTINUED ...
Page 75: ...LP 172 REV 2 16 06 74 ...
Page 76: ...LP 172 REV 2 16 06 75 ...
Page 77: ...MAINTENANCE NOTES 76 ...
Page 78: ...MAINTENANCE NOTES 77 ...
Page 79: ...MAINTENANCE NOTES 78 ...
Page 80: ... 2003 2009 Heat Transfer Products Inc www HTproducts com LP 276 REV 11 25 09 ...