![Heat Transfer MODCON VWH 300 HL Installation & Maintenance Download Page 35](http://html.mh-extra.com/html/heat-transfer/modcon-vwh-300-hl/modcon-vwh-300-hl_installation-and-maintenance_2115975035.webp)
PART 6: VENTING, COMBUSTION AIR & CONDENSATE REMOVAL
(CONTINUED)
E. EXHAUST VENT AND INTAKE AIR VENT
SIZING
1. The exhaust vent and intake air vent pipes
are 4" for the Mod Con 300 and 500, and 6"
for the Mod Con 850.
2. The total combined equivalent length of
exhaust vent and intake air pipe should not
exceed 200 feet.
a.
The equivalent length of elbows, tees,
and other fittings are listed in the Friction
Loss Table 6-8.
*Friction loss for long radius elbow is 1 foot less.
b. For example: If the exhaust vent has two
short 90° elbows and 10 feet of PVC pipe
we will calculate:
Exhaust Vent Pipe Equivalent Length = (2x3)+10=16 feet
Further, if the intake air vent pipe has two
short 90° elbows, one 45° elbow and 10
feet of PVC pipe, the following calculation
applies:
Intake Air Vent Pipe Equivalent Length = (2x3)+1+10=17 feet
c.
The intake air vent pipe and the exhaust
vent are intended to penetrate the same
wall or roof of the building.
d. You should keep an equivalent length
between the intake air vent pipe and the
exhaust vent. The minimum combined
equivalent length is 16 to 32 maximum
combined equivalent feet.
F. LONGER VENT RUNS
1. The maximum combined equivalent length
can be extended by increasing the diameter
of both exhaust vent and intake air vent pipe
equally. However, the transitions should
begin a minimum of 16 to 32 maximum
combined equivalent feet from the boiler on
both the intake and exhaust equally.
a.
The maximum equivalent length for the
increased diameter vent pipes is 275 feet,
which includes the combined 32 feet from
the boiler, 16 ft. (inlet) + 16 ft. (exhaust) =
32 ft. combined with transition total of 245
ft. upsize piping for longer vent runs.
G. EXHAUST VENT AND INTAKE AIR PIPE
INSTALLATION
1. Use only solid PVC, or CPVC schedule 40 or
80 pipe and AL294C Stainless Steel. FOAM
CORE PIPING IS ONLY ALLOWED FOR
INTAKE PIPING.
2. Remove all burrs and debris from joints and
fittings.
3. All joints must be properly cleaned, primed,
and cemented. Use only cement and primer
approved for use with the pipe material.
Refer to the Venting Table 6-4.
4. Horizontal lengths of exhaust vent must slope
back towards the boiler not less than ¼" per
foot to allow condensate to drain from the
Friction Loss Equivalent for
Stainless or Plastic Piping and Fittings
Fitting Description
4"
6"
8"
90° elbow short radius
3'
3'
3'
90° elbow long radius
2'
2'
2'
45° elbow
1'
1'
1'
Coupling
0'
0'
0'
Tee (intake only)
0'
0'
0'
V Series Vent Kit
1'
1'
1'
AL29 4C Vent Terminal
1'
1'
1'
Pipe (All materials)
1’
1’
1’
Table 6-8
Vent Transition Fitting
Size
Reducing Coupling
Final Vent Size
4" venting
6" x 4"
6"
6" venting
8" x 6"
8"
Table 6-9
n
WARNING
All joints of positive pressure vent systems
must be sealed completely to prevent leakage
of flue products into the living space.
NOTE: EXTENDED VENT
RUNS WHEN TRANSITIONING
TO A LARGER DIAMETER
MUST ALWAYS TAKE PLACE
IN A VERTICAL POSITION
TO PREVENT CONDENSATE
BLOCKAGE.
GAS-FIRED HOT WATER SUPPLY BOILER
Boiler Manual
34
Summary of Contents for MODCON VWH 300 HL
Page 23: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 22 ...
Page 24: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 23 ...
Page 25: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 24 ...
Page 26: ...PART 5 BOILER PIPING CONTINUED GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual 25 ...
Page 28: ...27 GAS FIRED HOT WATER SUPPLY BOILER Boiler Manual PART 5 BOILER PIPING CONTINUED ...
Page 75: ...LP 172 REV 2 16 06 74 ...
Page 76: ...LP 172 REV 2 16 06 75 ...
Page 77: ...MAINTENANCE NOTES 76 ...
Page 78: ...MAINTENANCE NOTES 77 ...
Page 79: ...MAINTENANCE NOTES 78 ...
Page 80: ... 2003 2009 Heat Transfer Products Inc www HTproducts com LP 276 REV 11 25 09 ...