)NSTALLINGTHE3TOVE
CONTINUED
)NSTALLATION
SUITE
7!2.).' ! ).#( MM "%!$
/& 34/6% #%-%.4 -534 "% 0,!#%$
!2/5.$4(% 34/6% 34!24).' #/,,!2
"%&/2% !44!#().'4(% &)234 6%.4
#/-0/.%.4 &!),52%4/ 3%!,4()3
*/).4-!9#!53%4(%34/6%4//0%2!4%
)-02/0%2,93%%4(%$)!'2!-
#ONTINUE!DDING6ENT#OMPONENTS
4OCONTINUEADDINGVENTCOMPONENTSINACCORDANCE
WITHTHEPREPLANNEDVENTSYSTEMCONlGURATION
s %NSURE THAT EACH SUCCEEDING VENT COMPONENT
IS SECURELY lTTED AND LOCKED INTO THE PRECEDING
COMPONENTINTHEVENTSYSTEM
ELBOWSMAYBEINSTALLEDANDROTATEDTOANYPOINT
AROUND THE PRECEDING COMPONENTS VERTICAL AXIS)F
ANELBOWDOESNOTENDUPINALOCKEDPOSITIONWITH
THEPRECEDINGCOMPONENTATTACHWITHAMINIMUMOF
THREE SHEETMETALSCREWS
!PPLYTHESTOVECEMENT
,INEUPTHEINTERNALBEADS
ANDROTATETHEPIPESECTIONS
CLOCKWISEUNTILLOCKED
,OCKTHEVENTCOMPONENTS
INTOPLACE
&IGURE
!TTACHINGTHE&IRST
6ENT#OMPONENTTOTHE
3TARTING#OLLARS
-ETTREDUCIMENTR£FRAC
TAIRE
!LIGNER
LES
lLETS
INT£RIEURS ET TOURNER
LESSECTIONSDECONDUIT
DANS LE SENS HORAIRE
JUSQUÜ CE QUELLES SE
BLOQUENT
6ERROUILLER LES SECTIONS
ENPLACE
&IGURE
0OSEDELAPREMIáRE
SECTIONSURLESCOLLIERS
DED£PART
!6%24)33%-%.4-%442% 5. &),%4 $%
--). $%#)-%.42»&2!#4!)2%
!54/52$5#/,,)%2$%$»0!24!6!.4
$%0/3%2,!02%-)³2%3%#4)/.0/52
'!2!.4)2 ,»4!.#(»)4» $% #% */).4
%4!3352%2,%"/.&/.#4)/..%-%.4
$%,!00!2%),$%#(!5&&!'%6/)2,%
3#(»-!
!JOUTDESECTIONS
0OUR AJOUTER DES SECTIONS SELON LA CONFIGURATION
PR£VUE
s 6EILLER Ü CE QUE CHAQUE SECTION SOIT £TROITEMENT
AJUST£EETVERROUILL£ESURLAPR£C£DENTE
,ESCOUDESÜPEUVENTäTREPOS£SETPIVOT£SDANS
NIMPORTE QUELLE POSITION DANS LAXE VERTICAL DE LA
SECTIONPR£C£DENTE3IUNCOUDENESEVERROUILLEPAS
SURLASECTIONPR£C£DENTELEBLOQUERAVECAUMOINS
TROIS VISÜT¹LE
ST ARTING
COLLA R
(COLLIE R D E DÉP ART )
FIRST
VENT
COMPONENT
(PREMIÈRE
SECTIO N
DU CONDUI T
DE VENTILA TION)
ST OVE SEALANT
BEAD 3/8"
(FILE T D E C IMENT
RÉFRACT
AIRE 9,5 mm)
1 INCH (25.4 mm)