22
®
Link
Heat
Link
Pure
®
Link Plus
Link
Pure
®
Link Plus
Link
Pure
®
Plus
Link
Pure
®
Link
Plus
Link
Pure
®
Link
Plus
First Position
Second Position
11⁄4" & 11⁄2" Standard Press Tool Instructions
2 Position Press; 11335 & 11341.
{
{
Regularly check tool jaws and sleeve
for any abnormalities that could be an
indication of a damaged tool.
{
{
If the Stainless Steel Sleeve is damaged or
pressed incorrectly, both the fitting and the
sleeve must be replaced.
{
{
The stainless steel press sleeve must
be completely pressed only one time. If
pressed more than once it is necessary to
cut out the fitting, and replace with new
sleeves and fitting.
{
{
Never reuse stainless steel press sleeves.
1. Open the tool jaws with the flat side of the tool facing
the fitting, place the tool onto the sleeve ~1⁄8" (3 mm)
away from the fitting end of the sleeve.
2. Close the jaws completely to make the first press.
3. Move the tool to ~1⁄2" (13
mm) away from the fitting
end of the sleeve, rotate the
position of the jaws on the
sleeve by 20-30°, and close
the jaws completely to finalize
the press connection. The
jaws can be removed over the
pressed sleeve.
4. A properly positioned tool results in an accurate press: inspect the connection to
ensure the tubing is still seated in the sleeve (only PEX is visible in the sight hole), and
that the press has been properly formed onto the sleeve. An improperly positioned
tool may result in a poor press and a damaged fitting.
Sight
Hole
Improperly
positioned
jaws
PEX
improperly
seated in
sleeve
~1⁄8" (3 mm)
~½" (13 mm)
20°-30°