![Heat Controller HKV Installation, Operation & Mainenance Manual Download Page 53](http://html1.mh-extra.com/html/heat-controller/hkv/hkv_installation-operation-and-mainenance-manual_2115768053.webp)
Heat Controller, Inc.
HKV LArge CommerCiAL
IOM Instructions
52
Step 12: Re-attach Blockoff Air Handler as shown.
Blockoff Air Handler
Blower Filler
Panel
C-Box/Motor Access
Panel
Compressor
Panel Access
Step 13: Put (3x) panels back on.
Reverse steps to change a Straight Discharge to a Top Discharge.