![Heat Controller HKV Installation, Operation & Mainenance Manual Download Page 47](http://html1.mh-extra.com/html/heat-controller/hkv/hkv_installation-operation-and-mainenance-manual_2115768047.webp)
Heat Controller, Inc.
HKV LArge CommerCiAL
IOM Instructions
46
Follow All Warnings and Cautions in
This Manual Before Attempting Conversion.
Top Discharge to Straight Discharge Convertible
No More Ordering New Panels From the Vendor
No More Buying a Different Size Belt
No More Heavy Lifting (Blower/Motor ASM)
What may have taken a day can now be a 15-minute job
Blower Access
Panel
C-Box/
Motor Access
Panel
Compressor
Access Panel
Step 1: Remove the three panels, as shown.
Field Conversion Options
Follow all warnings and cautions in this manual
before attempting conversion.