![Heat & Glo TIARAI-BK-IPI Installation Manual Download Page 20](http://html.mh-extra.com/html/heat-and-glo/tiarai-bk-ipi/tiarai-bk-ipi_installation-manual_2115509020.webp)
Heat & Glo • TIARAI-BK-IPI, TIARAI-BR-IPI, TIARAI-CES-IPI Installation Manual • 2342-980_R8 • 11/14
20
Rear Vent - Horizontal Termination
Figure 4.14
Figure 4.15
No Elbow
H
1
= 14 in. (356 mm) Maximum
H
1
= 14 in. (356 mm) Maximum
Note:
a derating orifice is required with this
application and is included in the Rear Vent Kit.
Note:
a derating orifice is required with this
application and is included in the Rear Vent Kit.
Note:
all horizontal vent pipe runs must have
1/4 inch rise per foot.
Note:
all horizontal vent pipe runs must have
1/4 inch rise per foot.
NOTICE: An SLK-SNKD is required for this
vent configuration.
NOTICE: An SLK-SNKD is required for this
vent configuration.
H
1
H
1
One 45º Elbow
Rear Vent - Horizontal Termination