
48
Heat & Glo • SL-5F, SL-7F Installation Manual • 2499-980 Rev. L • 10/19
5-7/8 IN.
MINIMUM
3 IN.
MINIMUM
Note:
Clearance from
opening to perpendicular wall.
UNLIMITED
FIREPLACE OPENING
See Dimension B on Appliance
Dimension Diagram (Figure 3.1).
B. Mantel and Wall Projections
WARNING! Risk of Fire!
Comply with all minimum clear-
ances as specified. Framing closer than the minimums listed
must be constructed entirely of non-combustible materials
(i.e., steel studs, concrete board, etc.).
Figure 10.3 Clearances To Combustible Mantels Or Other
Combustibles Above Appliance
Note:
All
measurements
in inches.
5 6
7 8
9 10
3
4
5
12
11
10
9
8
7
6
TOP OF HOOD OR FIREPLACE OPENING
4
12
13
11
32
CEILING
Figure 10.7 Non-Combustible Zone
1/2 in. SHEETROCK
OR COMBUSTIBLE
MATERIAL
3-1/2 in.
1/2 in.
NON-COMBUSTIBLE ZONE
Figure 10.6 Non-Combustible Mantel Leg or Wall Projections
(Acceptable on both sides of opening)
Note
: Clearance from opening
to perpendicular wall.
UNLIMITED
TOP VIEW
FIREPLACE OPENING
See Dimension B on
Appliance Dimension
Diagram (Figure 3.1).
3 IN. MIN.
6 IN. MAX.
Non-Combustible Mantel Leg or Wall Projection
Figure 10.5 Combustible Mantel Leg or Wall Projections
(Acceptable on one side of opening)
Combustible Mantel Leg or Wall Projections
3 FT. MAXIMUM
TOP VIEW
2-7/8 IN.
MINIMUM
1/2 IN.
MINIMUM
FIREPLACE OPENING
See Dimension B on Appliance
Dimension Diagram (Figure 3.1).
Note
: Clearance from opening
to perpendicular wall.
Figure 10.4 Combustible Mantel Leg or Wall Projection
(Acceptable on both sides of opening)