Heat & Glo • SL-750TRS-IPI-D, SL-550TRS-IPI-D, SL-350TRS-C • InD • 2065-985 Rev. o • 3/07
20
V
1
H
1
V
3
V
2
H
2
2. Top Vent - Vertical Termination - (continued)
Four 90 ° Elbows
Figure 5.17
V
1
H
1
V
2
H
2
V
3
1.5 ft.
457 mm
4 ft.
1.2 m
4 ft.
1.2 m
4 ft.
1.2 m
3.5 ft.
1.0 m
V
1
+ V
2
+ V
3 +
H
1
+ H
2
Maximum= 40 ft. (12.2 m)
Natural Gas and Propane
NOTE: There MUST be a
25% reduction in total H
when using
À
ex vent except
when using the simple up
and out installation (see
Figure 5.3 ).
Note:
Use SL-D Series
components only.
V
1
H
1
V
3
V
2
H
2
2. Top Vent - Vertical Termination - (continued)
Four 90 ° Elbows
Figure 5.17
V
1
H
1
V
2
H
2
V
3
1.5 ft.
457 mm
4 ft.
1.2 m
4 ft.
1.2 m
4 ft.
1.2 m
3.5 ft.
1.0 m
V
1
+ V
2
+ V
3 +
H
1
+ H
2
Maximum= 40 ft. (12.2 m)
Natural Gas and Propane
NOTE: There MUST be a
25% reduction in total H
when using
À
ex vent except
when using the simple up
and out installation (see
Figure 5.3 ).
Note:
Use SL-D Series
components only.