37
Heat & Glo • ST-36TR-IPI, PIER-36TR-IPI • 2176-900 Rev. L • 4/15
A. Pipe Clearances to Combustibles
WARNING! Risk of Fire!
Maintain air space clearance to
vent.
DO NOT
pack insulation or other combustibles:
• Between ceiling
fi
restops
• Between wall shield
fi
restops
• Around vent system
Failure to keep insulation or other material away from
vent pipe may cause over heating and
fi
re.
8
8
Vent Clearances and Framing
Figure 8.2 Wall Penetration
* Shows center of vent framing hole for top or rear venting. The center of the
hole is one (1) inch (25.4 mm) above the center of the horizontal vent pipe.
C
D
A*
B*
10 in.
10 in.
12 in.
12 in.
A*
B*
C
D
43-3/4 in.
28 in.
42-3/4 in.
27 in.
Figure 8.1 Horizontal Venting Clearances To Combustible
Materials
* When using SLP pipe, minimum clearances from the vent pipe to combustible materi-
als at wall shield firestops are:
Top: 2-1/2 in. (64 mm)
Bottom: 1/2 in. (13 mm)
Sides: 1 in. (25 mm)
Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm).
DVP heat shield
- designed to be used on a wall 4 in. to 7-1/4 in. (102 mm to 184
mm)
thick
.
,IZDOOWKLFNQHVVLVOHVVWKDQLQWKHH[LVWLQJKHDWVKLHOGVPXVWEHILHOGWULPPHG,I
wall thickness is greater than 7-1/4 in. a DVP-HSM-B will be required.
SLP heat shield
- designed to be used on a wall 4-3/8 in. to 7-5/8 in. (111 mm to
194 mm thick).
,IZDOOWKLFNQHVVLVOHVVWKDQWKHH[LVWLQJKHDWVKLHOGVPXVWEHILHOGWULPPHG
,IZDOOWKLFNQHVVLVJUHDWHUWKDQLQD'93+60%ZLOOEHUHTXLUHG
(DVP-SLP Pipe Shown)
3 in. (76 mm)
top clearance *
1 in. (25 mm)
clearance
bottom & sides
Heat
Shield
Wall
Shield
Firestop
Heat
Shield
WALL
3 in. (76 mm)
top clearance *
1 in. (25 mm)
clearance
bottom & sides
Heat
Shield
Wall
Shield
Firestop
Heat
Shield
WALL
3 in. (76 mm)
top clearance
1 in. (25 mm)
clearance around
vertical sections
Note:
When venting off the top of the unit and terminating
horizontally, using SLP pipe, a 10 in. x 10 in. framing hole
is required.
B. Wall Penetration Framing
Combustible Wall Penetration
Whenever a combustible wall is penetrated, you must
frame a hole for the wall shield
fi
restop(s). The wall shield
fi
restop maintains minimum clearances and prevents cold
air in
fi
ltration.
• The opening must be framed on all four sides using the
same size framing materials as those used in the wall
construction.
• SLP pipe - A wall shield
fi
restop must be placed on each
side of an interior wall. A minimum 1-1/2 in. (38 mm)
overlap of attached heat shields must be maintained.
• DVP pipe - A wall shield
fi
restop is required on one side
only on interior walls. If your local inspector requires a
wall shield
fi
restop on both sides, then both wall shield
fi
restops must have a heat shield (refer to Section 16.B.)
attached to them.
• See Section 10.M. for information for regarding the in-
stallation of a horizontal termination cap.
Non-Combustible Wall Penetration
If the hole being penetrated is surrounded by noncom-
bustible materials such as concrete, a hole with diameter
one in. greater than the pipe is acceptable.
Whenever a non-combustible wall is penetrated, the wall
shield
fi
restop is only required on one side and no heat
shield is necessary.