G. Thermostat Installation

The kit comes with a programmable wall thermostat and 

25’ of thermostat wire. If you need to run more than 25’ 

make sure you use a continuous strand of 18 to 22 gauge 

thermostat wire. For optimum performance your thermostat 

should be:

•  Mounted on an inside wall, approximately 5’ above 

the floor

•  Do not locate where there is poor air circulation such 

as in a corner, alcove, behind doors, bookcase or 

other objects

•  Located away from drafts, direct sunlight, above a 

lamp, television, radiator, a wall next to a window, or 

direct heat from the appliance

•  Avoid damp environments as this can lead to corrosion 

that may shorten thermostat life

•  If painting or construction work around, cover the 

thermostat completely or wait until work is complete 

before installation.

Figure 23.1

1.  Separate the body of the thermostat from the 

mounting plate by gently pulling the two pieces apart 

(Figure 23.1)

.

2.  Use a drill with either a 3/16 drill bit for drywall or a 7/32 

drill bit for plaster drill holes.

3.  Using a hammer tap in wall anchors.

4.  Route the wires through the opening in the base plate, 

and hold the base against the wall while aligning up 

to the holes. Attach base plate using a Phillips head 

screwdriver and two screws.

5.  Connect your thermostat wire to the W and R terminals 

(Figure 23.2)

.

W

R

W

R

Appliance

BATTERY

BATTERY

NOTE:

 Ensure bare wire ends are held ALL the way 

into the terminal block while the screws are 

being tightened.

6. 

There are two AA ALKALINE ONLY batteries already 

installed into the thermostat; to activate, remove 

black plastic tab that is located inside the battery 

compartment.

7.  Snap the thermostat to the base plate.

Figure 23.2

Figure 23.3

Figure 23.3

Junction Box 

Cut Away 

LEFT SIDE 

Junction Box, Front 

Power 

Cord 

Recepticle 

Terminal Block 

Center 2 Screws 

for Thermostat wires or remote 

110 Outlet for 

Remote 

Control Only 

(unfused) 

Fuse 

Red Call 

Light 

Connect thermostat wires to appliance:

There is a 4 screw terminal block located on the back 

lower left corner of the stove directly above the power cord 

inlet. The center 2 screws are for the thermostat wires 

(Figure 23.3)

.

Shock hazard.

• 

Do NOT remove grounding prong 

from plug.

•  Plug directly into properly grounded 3 

prong receptacle.

•  Route cord away from appliance.

• 

Do NOT route cord under or in front of 

appliance.

CAUTION

Summary of Contents for Quadra-Fire SANTA FE SANTAFEI-C

Page 1: ...iquids in the vicinity of this or any other appliance Do not over fire If appliance or chimney connector glows you are over firing Over firing will void your warranty Comply with all minimum clearance...

Page 2: ...and Components 6 E Install Checklist 7 3 Dimensions and Clearances 8 A Appliance Dimensions 8 B Clearance To Combustibles UL and ULC 9 C Masonry Chimney and Fireplace Clearances 10 D Minimum Opening f...

Page 3: ...800 to 22 400 hr BTU Input 9 300 to 30 600 hr Vent Size 3 4 L or PL or 6 inches Hopper Capacity 45 lbs Fuel Premium Wood Pellets Weighted average LHV Low Heating Value efficiency using data collected...

Page 4: ...om size out air must be installed I California Prop65 WARNING This product and the fuels used to operate this product wood and the products of combustion of such fuels can expose you to chemicals incl...

Page 5: ...ior to installation Installation MUST comply with local regional state and national codes and regulations Consult insurance carrier local building inspector fire officials or authorities having jurisd...

Page 6: ...ation to ensure maximum safety and benefit Follow pipe manufacturer instructions for installation and air clearance requirements C Tools And Supplies Needed Tools and building supplies normally requir...

Page 7: ...ation and copying this checklist for your file That this checklist remain visible at all times on the appliance until the installation is complete Electrical 120 VAC unswitched power provided to the a...

Page 8: ...23 5 8 in 600mm 9 5 8 in 246mm 11 1 8 in 283mm 21 1 2 in 546mm 12 3 4 in 325mm 9 1 2 in 243mm 30 in 762mm 40 in 1016mm 14 5 8 in 373mm 9 7 8 in 250mm Figure 8 4 Front View with large basic panel set...

Page 9: ...or protection The size of your floor protector choice must be added to this dimension 25 in 635mm 25 in 635mm 32 7 8 in 835mm 15 1 4 in 387mm NOTE Illustrations reflect typical installations and are F...

Page 10: ...ng dimensions include a 1 4 6mm clearance around unit NOTE If trim measurement is over 3 4 in 19mm in depth use mantle or side clearances to combustibles Location Inches Millimeters A Height 23 1 4 59...

Page 11: ...d 250 2061 WARNING THIS FIREPLACE MAY HAVE BEEN ALTERED TO ACCOMMODATE AN INSERT IT MUST BE RETURNED TO ITS ORIGINAL CONDITION BEFORE USE AS A SOLID FUEL BURNING FIREPLACE 250 2061 Heath Home Technolo...

Page 12: ...uilt zero clearance fireplace system must not be altered The flue liner top support attachment must not reduce the air flow for the existing air cooled chimney system No dilution air is allowed to ent...

Page 13: ...and protruding parts of the structure P 12 in Clearance above roof line for vertical terminations All minimum clearances are listed with an Outside Air Kit OAK installed unless otherwise noted in tabl...

Page 14: ...and House demand may consume the air needed for the appliance It may be necessary to add additional ventilation to the space in which the pellet appliance is located Consult with your local HVAC profe...

Page 15: ...unted duct work and air handler joints and seams taped or sealed E Chimney and Exhaust Connection 1 Chimney Connector Use 3 or 4 inch 76 102mm diameter type L or PL venting system It can be vented ver...

Page 16: ...his installation Figure 16 2 1 Locate the calculated equivalent feet of pipe on the vertical left side of the chart 2 Move to the right horizontally on the chart until you reach your altitude above se...

Page 17: ...any edge to prevent future serviceability Fire Risk Inspection of Chimney Masonry chimney must be in good condition Meets minimum standard of NFPA 211 Factory built chimney must be a minimum 6 inch 15...

Page 18: ...passage through a wall or partition of combustible construction is desired the installation shall conform to CAN CSA B365 NOTE Illustrations reflect typical installations and are FOR DESIGN PURPOSES O...

Page 19: ...N ULC S635 Standard for Lining Systems for Existing Masonry or Factory Built Chimneys and Vents or CAN ULC S640 Standard for Lining Systems for New Masonry Chimneys 12 305mm min below 12 305mm min abo...

Page 20: ...ure 20 2 4 Slide trim ring over flex pipe and run pipe through wall 5 Attach hose to outside termination cap with second hose clamp 6 Secure termination cap to outside surface 7 Secure trim ring to in...

Page 21: ...tape 6 Place cut edge of trim under top lip and into position on scissors Place side pieces on first and then front piece The front piece overlaps side pieces 7 Once you are satisfied with the positio...

Page 22: ...each leg Figure 22 2 3 Open the hopper lid by pulling toward you This will make it easier to set the panels in place Secure the panels to the insert 2 screws per leg as shown in Figure 22 3 4 Connect...

Page 23: ...wall anchors 4 Route the wires through the opening in the base plate and hold the base against the wall while aligning up to the holes Attach base plate using a Phillips head screwdriver and two screw...

Page 24: ...firebox 4 Push the logs to the far left and far right against the sides of the firebox Figure 24 2 5 To clean the logs use a vacuum and a soft brush attachment or a paint brush Figure 24 2 Figure 24 1...

Page 25: ...rd HUD CFR 3280 Part 24 PART NUMBER 811 0872 Spark Arestor Cap Roof Flashing Storm Collar Joist Shield Firestop Double Wall Connector Pipe Figure 25 1 CAUTION THE STRUCTURAL INTEGRITY OF THE MOBILE HO...

Page 26: ...7019 801C July 10 2019 26 SANTA FE PELLET INSERT 8 Reference Materials A Service Maintenance List Date of Service Performed By Description of Service...

Page 27: ...7019 801C July 10 2019 27 SANTA FE PELLET INSERT Date of Service Performed By Description of Service...

Page 28: ...7019 801C July 10 2019 28 SANTA FE PELLET INSERT Date of Service Performed By Description of Service...

Page 29: ...7019 801C July 10 2019 29 SANTA FE PELLET INSERT Date of Service Performed By Description of Service...

Page 30: ...kel SP SFI3040 NB Nickel SP SFI3040 NL Bracket L Trim 832 0840 Logo Quadra Fire Nickel 7000 649 10 Reset Button Assembly SRV7000 040 Smart Batt Il 841 0970 Smart Stat Il 841 0960 Thermostat Programmab...

Page 31: ...4 7000 157 24 Y Nut Wing 1 4 20 Pkg of 12 226 0110 12 Nut Wing 8 32 Pkg of 24 226 0160 24 Y Pin 3 16 X 1 2 7000 229 Rivet Iron 1 4 X 1 1 4 Pkg of 25 229 0090 25 Screw Flat Head 1 4 20 Pkg of 24 7000 1...

Page 32: ...purchased installed _________________________________________________________________________ Serial Number ____________________________________ Location on appliance ___________________________ Deale...

Reviews: