7
04/21
7094-802A
ATTENTION INSTALLER:
Follow this Standard Work Checklist
This standard work checklist is to be used by the installer in conjuction with, not instead of, the instructions contained in this installation manual.
Customer:
Date Installed:
Lot / Address:
Location of Appliance:
Installer:
Dealer / Distributor Phone #:
Serial #:
Model:
WARNING! Risk of Fire or Explosion!
Failure to install appliance according to these instructions can lead to a fire or explosion.
Appliance Install
Verified clearances to combustibles.
Appliance is leveled and connector is secured to appliance.
Hearth extension size/height decided.
Outside air kit installed.
Floor protection requirements have been met.
If appliance is connected to a masonry chimney, it should be cleaned and
inspected by a professional. If installed to a factory built metal chimney, the
chimney must be installed according to the manufacturer’s instructions and
clearances.
Chimney
Chimney configuration complies with diagrams.
Chimney installed, locked and secured in place with proper clearance.
Chimney meets recommended height requirements (14-16 feet).
Roof flashing installed and sealed.
Terminations installed and sealed.
Clearances
Combustible materials not installed in non-combustible areas.
Verified all clearances meet installation manual requirements.
Mantels and wall projections comply with installation manual requirements.
Protective hearth strips and hearth extension installed per manual requirements.
Appliance Setup
All packaging and protective materials removed.
Firebrick, baffle and ceramic blanket installed correctly.
All labels have been removed from the door.
All packaging materials are removed from inside/under the appliance.
Manual bag and all of its contents are removed from inside/under the appliance
and given to the party responsible for use and operation.
Hearth & Home Technologies recommends the following:
• Photographing the installation and copying this checklist for your file.
• That this checklist remain visible at all times on the appliance until the installation is complete.
Comments: Further description of the issues, who is responsible (Installer/Builder/Other Trades, etc.) and corrective action needed:
Comments communicated to party responsible ____________________________ by _____________________ on ___________
(Builder / Gen. Contractor)
(Installer)
(Date)
_________________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
________________________________________________________________________
___________________________________________________________________________________
___________________________________________________________________
___________________________________________________________________________________
____________________________________________________________________________________
YES IF NO, WHY?
______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
______________________________________
F. Install Checklist
Summary of Contents for Expedition-I
Page 2: ...Project 21 661 Model Expedition I Page 1 This page intentionally left blank ...
Page 12: ...Project 21 661 Model Expedition I Page 11 Firebox Volume ...
Page 13: ...Project 21 661 Model Expedition I Page 12 Appliance Front Appliance Left ...
Page 14: ...Project 21 661 Model Expedition I Page 13 Appliance Right Appliance Rear ...
Page 18: ...Project 21 661 Model Expedition I Page 17 Sealed Unit ...
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 107: ...26 04 21 7094 802A Date of Service Performed By Description of Service ...
Page 108: ...27 04 21 7094 802A D Accessories ...
Page 109: ...28 04 21 7094 802A ...
Page 110: ...29 04 21 7094 802A ...
Page 133: ...22 7094 803A 04 21 Date of Service Performed By Description of Service ...
Page 134: ...23 7094 803A 04 21 B Service Parts List ...
Page 135: ...24 7094 803A 04 21 ...
Page 136: ...25 7094 803A 04 21 ...
Page 137: ...26 7094 803A 04 21 ...
Page 138: ...27 7094 803A 04 21 ...
Page 146: ......
Page 153: ......
Page 154: ......
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 159: ......
Page 161: ......
Page 166: ......
Page 167: ......