Figure 2.20  Secure with Screws

G. Install Roof Flashing and Vertical Termination Cap

To attach the vertical termination cap, slide the inner collar 
of the cap into the inner fl ue of the pipe section  and place 
the outer collar of the cap over the outer fl ue of the pipe 
section.

Secure with three screws into the outer fl ue. Secure the cap 
by driving the three self-tapping screws (supplied) through 
the pilot holes in the outer collar of the cap into the outer fl ue 
of the pipe (see Figure 2.20).

Horizontal
overhang

12

X

20 in.

(508 mm)

Lowest

Discharge

Opening

Termination

Cap

Roof Pitch
is X / 12

Vertical
wall

H (min.) - Minimum height
from roof to lowest
discharge opening.

24 in. min.

(610 mm)

Roof Pitch 

H (Min.) Ft. 

Roof Pitch 

H (Min.) Ft.

Flat to 6/12 

1.0* 

Over 11/12 to 12/12 

4.0

6/12 to 7/12 

1.25* 

Over 12/12 to 14/12 

5.0

Over 7/12 to 8/12 

1.5* 

Over 14/12 to 16/12 

6.0

Over 8/12 to 9/12 

2.0* 

Over 16/12 to 18/12 

7.0

Over 9/12 to 10/12 

2.5 

Over 18/12 to 20/12 

7.5

Over 10/12 to 11/12 

3.25 

Over 20/12 to 21/12 

8.0

* 3 ft. minimum in snow regions

Storm Collar

Roof

Flashing

Figure 2.19  Minimum Height from Roof to Lowest Discharge 
Opening

To install roof fl ashing see Figure 2.19.  

For installation of vertical termination cap see minimum vent 
heights for various pitched roofs (Figure 2.19) . 

Fire Risk
Explosion Risk

Inspect external vent cap regularly.
•  Ensure no debris blocks cap.
• 

Combustible materials blocking cap may 
ignite.

•  Restricted air flow affects burner 

operation.

WARNING

Storm
Collar

Termination Cap

(1 of three)

Caulk

Screws

Brackets/

Bolts

Summary of Contents for BEK

Page 1: ...e assembly instructions See the appliance installation instructions for con guration of vent assembly and clearances to pipe If DVP AD adapters are used off the top of the appliance the termination he...

Page 2: ...0ST 90 elbow DVP WS wall shield with heat shield DVP TRAP1 termination cap with telescoping ue and one fastener pack DVP TRAPK2 Vent kit containing DVP90ST 90 elbow DVP WS wall shield with heat shield...

Page 3: ...in 6 in Slip Section Vent Pipe to be used with another piece of pipe DVP12A 3 in 12 in Slip Section Vent Pipe to be used with another piece of pipe DVP12MI 12 in Vent Pipe non unitized can be cut to l...

Page 4: ...0 7 8 in 6 3 4 in to 10 3 4 in GNTC50 5 in to 6 3 4 in 4 7 8 in to 6 5 8 in 7 3 8 in to 11 3 8 in 7 3 8 in to 11 3 8 in Designer 4 in to 5 3 4 in 5 3 4 in to 7 1 2 in 6 3 8 in to 10 3 8 in 8 1 8 in to...

Page 5: ...urations 2 Installing Vent Pipe B Penetrating a Wall Wherever a combustible wall is penetrated the hole must be framed with an interior wall shield DVP WS as shown in Figures 2 3 2 4 This shield maint...

Page 6: ...he pipe section into the appliance collar until all the lances see Fig ure 2 5 have snapped in place Tug slightly on the section to con rm it has completely locked into place Assemble Pipe Sections In...

Page 7: ...an then be attached by tting another pipe section to it and snapping it together as normal Assemble Slip Sections The outer ue of the slip section should slide over the outer ue of the pipe section an...

Page 8: ...e either section see Figure 2 14 so that the seams on both pipe sections are aligned see Figure 2 15 They can then be carefully pulled apart Figure 2 12 Securing Vertical Pipe Sections Figure 2 13 Sec...

Page 9: ...e cap in the same manner See Figure 2 16 If the wall thickness does not allow the required 1 1 2 in heat shield overlap an extended heat shield must be used The extended heat shield will need to be cu...

Page 10: ...17 Installing Firestop Spacer 3 fasteners per side Attic insulation shield installed below ceiling Attic insulation shield installed above ceiling Bend tabs in around pipe Figure 2 18 Installing the A...

Page 11: ...rom roof to lowest discharge opening 24 in min 610 mm Roof Pitch H Min Ft Roof Pitch H Min Ft Flat to 6 12 1 0 Over 11 12 to 12 12 4 0 6 12 to 7 12 1 25 Over 12 12 to 14 12 5 0 Over 7 12 to 8 12 1 5 O...

Page 12: ...ded through the brackets and tighten nut to complete the storm collar assembly see Figure 2 22 Make sure the collar is tight against the pipe section Slide the assembled storm collar down the pipe sec...

Reviews: