I
Contents
1.1 Confirm the ordering products
........................................................................................... 1
1.3 System operating environment
.......................................................................................... 1
2.3 Specifications for the system
............................................................................................. 2
2.4 Diagram of the Smart-NE system
......................................................................................3
Chapter 3 Instructions before installation
................................................................................4
3.2.1 Pressure reducing valve CR-SP829
.......................................................................4
3.2.2 Systematic data recording package CR-SP840
................................................... 4
3.2.3 Enhanced pretreatment cartridge CR-SP102
....................................................... 4
3.2.4 Water leakage sensor CR-SP846
...........................................................................4
4.1 Accessory installation of storage tank
.............................................................................. 5
4.2.1 Feed pipeline and drain pipeline installations
....................................................... 5
4.2.2 Pipeline connections between main unit and water tank
.................................... 5
4.2.3 Pipeline connections between main unit and RWD
............................................. 6
4.3.3 Cable connect between main unit and RWD
........................................................ 7
4.4.1 Open the side door of the main unit
....................................................................... 7
4.4.2 The position of the main components
.................................................................... 7
4.4.3 Installation of pretreatment cartridge
......................................................................8
4.4.4 Installation of purification cartridge(CR-SP303M)
................................................ 8
Chapter 5 Parameter setting and operation
........................................................................... 10
5.3 Symbols and graphics for LCD display
...........................................................................10
5.6.3 Volume of taking product water setting
................................................................ 14
........................................................................................... 14
5.6.5 Ultra-pure water quality setting
..............................................................................15
6.3 Maintenance works and service works
...........................................................................16
6.3.2 Into the maintenance settings
................................................................................17