7 Cleaning and servicing the heating system – Procedure
56
C
LEANING
TOOLS
1 Brush handle
2 Cleaning brush
3 Scraper
4 Ash shovel
5 Wall holder
C
LEAN
THE
FUEL
CHAMBER
AND
SECONDARY
AIR
OPENINGS
1.
Allow the fire in the boiler to burn out and cool off.
2.
Press the
Reload
button.
✓
On the display of the control unit, the following message appears:
“DO NOT OPEN! Please wait”
.
✓
The flue gas fan starts to run.
3.
Wait for approx. 15 seconds until the “
Open filling hatch
”
message appears.
✓
On the display of the control unit, the following message appears:
“
Open filling hatch
”.
Important!
Before beginning cleaning and maintenance work, the message
“
Boiler OFF
” must appear on the display of the HDG Lambda
Control 1 plus/2 plus control unit, in other words, the display
Boiler
ON
may not be lit.
✎
See the chapter entitled “6 Using the heating system”, section
“6.1 Overview of the controls and display components”.
Figure 7/1 - Cleaning tools
2
3
1
4
5
Important!
✎
Observe the “Generally applicable safety instructions” in this
section.
Summary of Contents for Navora 20
Page 1: ...hdg bavaria com HDG Navora 20 25 30 HDG Navora 40 45 50 Operation Manual ...
Page 2: ......
Page 77: ...77 NOTICE ...
Page 78: ...78 HDG Navora 40 45 50 Version 1 de HDG Bavaria GmbH 06 2008 NOTICE ...
Page 79: ......