4 Planning and installation – Scope of delivery
30
4.5 Scope of delivery
The boiler is delivered on a pallet. Included in the scope of delivery:
•
Boiler HDG F20-50
•
Cladding
•
Cleaning tools
•
Control unit HDG Control Touch
•
Accessories
•
Operating documentation
4.6 Installing the heating system
R
EQUIREMENTS
The heating system is installed by specialists from HDG Bavaria
GmbH or an authorised HDG partner and a qualified electrician.
Important!
Upon delivery, small parts are located in the fuel chamber of the
HDG F20-50 boiler.
Danger!
Risk of material damage and injury due to incorrect installation
Installing the system requires comprehensive specialist knowledge.
If installed by untrained persons, the heating system can be
damaged and persons may be injured due to secondary damage.
Only allow authorised specialists to perform the installation.
Danger!
Dangerous electrical current or voltage
Switch off the mains supply to the heating system during the
installation.
Summary of Contents for F20
Page 1: ...hdg bavaria com HDG F20 25 30 HDG F40 50 Operating manual ...
Page 2: ......
Page 87: ......