Programming Scenarios
Below is one possible Stand Alone scenario.
6 am
5:45 am
9 am
12 noon
Timer 8: Pump comes on at 6 am and goes off at 5:45 am
Set to run the entire timing sequence at the low speed setting.
Timer 1: At 9 am pump kicks into the speed
needed for cleaner to operate. Goes back to
timer 8 speed at 12 noon.
1 pm
3 pm
Timer 2: At 1 pm pump kicks into speed
needed for solar operation. Goes back to
timer 8 speed at 3 pm.
Speed settings can be set to meet spa
jet or any water feature requirement.
The lower the timer number the higher the priority. In other words,
timer 1 will override timer 8 settings if they are set over each other.
Page 34