Haws 611970358420 Installation, Operation & Maintenance Instructions Manual Download Page 6

10/08 

      Model H1001.8/H1001.8HPS 

Page 4 of 7 

 

INSTALLATION PROCEDURE…

 

 

Step 8

Thoroughly flush supply line to remove all foreign matter. Connect 1/2” IPS 
supply screwdriver stop (not supplied) to stub-out in wall. Place chiller on chiller 
support tray against right hand side, fully to rear, with condenser  (open  panel) 
side facing to front. Install supply, 3/8” O.D. tubing (not supplied), between 
screwdriver stop (not supplied) and strainer at chiller inlet. (Cut tubing to proper 
length, and follow general notes for proper connection procedure for push-in style 
fittings). Tubing insulation is not normally required on inlet side of chiller. Install 
insulated tube (supplied) between fountain and chiller outlet. Cut tubes as 
required and connect to chiller outlet compression fitting. Open screwdriver stop 
wide open while checking for leaks at all connections.  Also  check  waste  for 
leaks. 

 

Step 9

Adjust bubbler stream height using a small flat-head screwdriver inserted through 
a hole in the center of the push button.  For increased flow turn clockwise and for 
decreased flow turn counterclockwise.  If flow problems arise, see 
troubleshooting guide for additional instructions to correct problems.  Bubbler 
stream may lower during short break-in period.  Set initial stream height a little 
high to minimize or eliminate the need for break-in period readjustment. 

 

Step 10: 

Verify that electrical power is off and power supply voltage, phase and cycle 
match specifications printed on chiller label. In accordance with local codes, wire 
directly to incoming lines at internal chiller junction box.  Verify  that  all  inner 
packing is removed and hand rotate fan blade to verify free rotation. Reattach 
chiller front panel. Turn power on and verify that chiller cycles off after water 
reaches proper temperature. Finally check for leaks. 

 

Step 11:          

Install grille and tighten outer side screws. Verify there is chilled water out of 
bubbler.

  

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 

 
 
 
 
 

 

FIGURE 1 

Reviews: