Haws 611970358420 Installation, Operation & Maintenance Instructions Manual Download Page 5

 

 

10/08 

Model H1001.8/H1001.8HPS 

Page 3 of 7 

 

 

 

 

INSTALLATION PROCEDURE…

 

 

Step 1: 

Provide wall opening as detailed in Installation Drawing.  Frame must be 
positioned such that frame flanges overlap and butt against finished wall surface.  
Mounting holes are provided for #6 sheet metal screws.  After frame is positioned 
in wall, swing chiller support tray into position (See Installation Drawing), align 
tray holes with holes in frame and fasten with #10 sheet metal screws.  Mounted 
frame must support 50 pound chiller in addition to fountain weight and user 
generated forces.

 

 

Step 2: 

Install waste, supply and electrical lines in locations shown in Installation 
Drawing.  Waste and supply lines may be installed for either rear or side entry. 
Verify proper waste, supply, electrical and frame locations. Use level to verify 
horizontal and vertical frame mounting to insure proper bowl drainage. 

 

Step 3: 

Installation Drawing shows fountain bowl, back panel and grille locations. Unpack 
bowl and remove bottom plate using 3/32” hex allen wrench. Install back panel 
on frame with narrower edge to bottom. Position nut retainers into mounting 
frame and use two 5/16-18x1 hex head screws partially started in outside holes 
to support panel.  Install bowl/bracket assembly onto panel using four 5/16-18x1 
hex head screws hand tightened.  See sheet 2 of Installation Drawing for 
appropriate bowl mounting pattern to use for this model 

 

Step 4: 

Remove 1-1/2” IPS outlet elbow from trap (not supplied). Install elbow inside 
frame onto waste stub-outs. Reassemble trap “U” bend with inlets centered 
behind fountains.  

 

Step 5: 

Remove slip joint nuts from bottom of fountain waste outlet. Assemble nut over 1-
1/4” O. D. end of waste elbow as supplied by Haws. Assemble waste elbow onto 
bowl waste body using seal washer provided and tighten nut hand tight. Measure 
vertical distance down to trap inlet and cut the vertical (not supplied) elbow to 
length allowing 1/2” minimum for engagement into trap. Mark and similarly cut to 
length the horizontal waste elbow. Install elbow and tighten all the slip joint nuts.

 

 

Step 6: 

See Figure 2 for detail section view of side screw grille attachment. Unpack grille 
and insert upper lip behind bottom of back panel, align sides and hold up flush to 
bottom of back panel. Hold grille against wall and mark centers of grille side slots 
on wall. Masking tape may be used to prevent finished wall damage from mark. 
Install the “s” clips in mounting frame using #10 sheet metal screws into pre-
drilled holes on lower end of each side of frame. Tighten #10 screw while holding 
“s” clips centered on wall marks. Check grille fit by installing grille and partially 
tightening #6-23 socket head screws through side of grille. Insure proper panel 
and grille alignment, then tighten four 5/16-18x1 hex head screws. 

 
Step 7: 

Unpack and remove chiller from carton. Remove front panel screws and panel.  
Do not remove insulating putty and foam from copper tubes or Styrofoam 
insulation from evaporator coil. Remove any inner packing, which may be around 
compressor.  If applicable, remove junction box cover and electrical knock out on 
lower right side of housing.  Install fittings (supplied) on chiller inlet and outlet 
tubes (See Installation Drawing). 

 

 
 
 
 