
10/08
Model H1001.8/H1001.8HPS
Page 3 of 7
INSTALLATION PROCEDURE…
Step 1:
Provide wall opening as detailed in Installation Drawing. Frame must be
positioned such that frame flanges overlap and butt against finished wall surface.
Mounting holes are provided for #6 sheet metal screws. After frame is positioned
in wall, swing chiller support tray into position (See Installation Drawing), align
tray holes with holes in frame and fasten with #10 sheet metal screws. Mounted
frame must support 50 pound chiller in addition to fountain weight and user
generated forces.
Step 2:
Install waste, supply and electrical lines in locations shown in Installation
Drawing. Waste and supply lines may be installed for either rear or side entry.
Verify proper waste, supply, electrical and frame locations. Use level to verify
horizontal and vertical frame mounting to insure proper bowl drainage.
Step 3:
Installation Drawing shows fountain bowl, back panel and grille locations. Unpack
bowl and remove bottom plate using 3/32” hex allen wrench. Install back panel
on frame with narrower edge to bottom. Position nut retainers into mounting
frame and use two 5/16-18x1 hex head screws partially started in outside holes
to support panel. Install bowl/bracket assembly onto panel using four 5/16-18x1
hex head screws hand tightened. See sheet 2 of Installation Drawing for
appropriate bowl mounting pattern to use for this model
Step 4:
Remove 1-1/2” IPS outlet elbow from trap (not supplied). Install elbow inside
frame onto waste stub-outs. Reassemble trap “U” bend with inlets centered
behind fountains.
Step 5:
Remove slip joint nuts from bottom of fountain waste outlet. Assemble nut over 1-
1/4” O. D. end of waste elbow as supplied by Haws. Assemble waste elbow onto
bowl waste body using seal washer provided and tighten nut hand tight. Measure
vertical distance down to trap inlet and cut the vertical (not supplied) elbow to
length allowing 1/2” minimum for engagement into trap. Mark and similarly cut to
length the horizontal waste elbow. Install elbow and tighten all the slip joint nuts.
Step 6:
See Figure 2 for detail section view of side screw grille attachment. Unpack grille
and insert upper lip behind bottom of back panel, align sides and hold up flush to
bottom of back panel. Hold grille against wall and mark centers of grille side slots
on wall. Masking tape may be used to prevent finished wall damage from mark.
Install the “s” clips in mounting frame using #10 sheet metal screws into pre-
drilled holes on lower end of each side of frame. Tighten #10 screw while holding
“s” clips centered on wall marks. Check grille fit by installing grille and partially
tightening #6-23 socket head screws through side of grille. Insure proper panel
and grille alignment, then tighten four 5/16-18x1 hex head screws.
Step 7:
Unpack and remove chiller from carton. Remove front panel screws and panel.
Do not remove insulating putty and foam from copper tubes or Styrofoam
insulation from evaporator coil. Remove any inner packing, which may be around
compressor. If applicable, remove junction box cover and electrical knock out on
lower right side of housing. Install fittings (supplied) on chiller inlet and outlet
tubes (See Installation Drawing).