www.havis.com • 1-800-524-9900
8
13
4)
Secure I/O Cover to Docking Station, being careful not to pinch cables.
Use T8 Torx Bit (Hardware Kit Item #4) and (6x) #4-40 x 3/8” long
Tamper-Proof Screws (Hardware Kit Item #3).
Torque screws to 8 - 10 in-lbs (0.9 - 1.1 Nm).
NOTE: If a DS-DELL-704/705/706 was purchased, go to page 11 for IP-65
Cable Installation prior to securing the I/O Cover to Docking Station.
5)
Bundle all cables and route as shown to the corner of Docking Station and
secure with Zip Ties provided (Hardware Kit Item #1).
Cable Management
(continued)
Installation
(continued)
Optional Mounting Alternative
DS-DELL-700 Series is equipped with mounting features required to secure a
Ram D202U Ball Mount. If this mounting method is desired, secure Ram
Ball (not included) to DS-DELL-700 Series as shown using (4x) 1/4”-20 x 1 /2”
long flat head screws (not provided).
Torque screws to 50 - 60 in-lbs (5.6 - 6.8 Nm).
VORSICHT
ENTFERNEN SIE FÜR DIESE BEFESTIGUNGSMETHODE NICHT DIE
VESA 75 BEFESTIGUNGSHARDWARE.
PRUDENCE
POUR CETTE MÉTHODE DE MONTAGE, NE PAS RETIRER LA QUINCAILLERIE VESA 75.
FOR THIS MOUNTING METHOD, DO NOT REMOVE VESA 75 MOUNTING HARDWARE.
PRECAUCIÓN
PARA ESTE MÉTODO DE MONTAJE, NO RETIRE LOS TORNILLOS DEL MONTAJE VESA 75.