
Step 2 - Select Your Ducting Option
Option 1-vertical discharge
6" round duct installation
6" round duct installation (Fig. A) on
the top of the hood, using 10 screws
(adapter pre-installed at factory)
Option 2-vertical discharge
3-1/4" x 10" duct installation
Mount the 3-1/4" x 10" adapter (Fig. B)
on the top of the hood, using 10 screws
Option 3- horizontal discharge
3-1/4" x 10" duct installation
Mount the 3-1/4" x 10" adapter on the
BACK of the hood.
1. Remove the adapter {Fig. A) on
the top of the hood.
2. Replace with the shutoff plate
{Fig. C)
3. Remove and discard rectangular
shutoff plate (Fig. D) located on
the back of the hood.
4. Remove and discard the small
shutoff plate (Fig. E) located IN
SIDE the back ofthe hood. DO
NOT remove the gasket!
5. Install the adapter with 10
screws previous removed at
step 4.
Fig. A
Fig. B
Fig. C
Fig. D
Fig. E
I
Fig. F
I
Page:8
Step 3 - Preparing The Range Hood
1. Unpacking and check the contents. Test the range hood to check all the function is normal
before you installation. Remove wiring cover screw and lift off cover (Fig.1)
2. Remove the top or the rear electrical knockout, bring power cord to the range hood
(through the cabinet) (Fig.2)
KEYHOLE
SLOTS
3. Insert a screwdriver into the knockout slot and bend the knockout back and forth
(FIG.3-1).You may have to use pliers to pull the loosened knockout free (FIG.3-2)
Miii¼IM
f--
-
-
-
�
liilf■
Page:9
Hauslane
267 Wattis Way, San Francisco, CA 94124
Tel: 1-800-929-0168 E-mail: [email protected]
Hauslane
267 Wattis Way, San Francisco, CA 94124
Tel: 1-800-929-0168 E-mail: [email protected]