6. Operating checks and
repair work
6.1.
Checking operation of air cleaner
maintenance indicator
Every 250 hours of operation, perform a routine
check on the maintenance indicator or mainte-
nance switch and the display light.
– Detach the capsule hood or side trim
(see Chapter 2).
Electric maintenance switch
– Turn switch key to position I (Figure 12).
– Pull hose „2“ off air intake pipe and build up a
strong vacuum at the open end (Figure 37).
Indicator light „5“ will come on (Figure 13).
If this response is not obtained, check the fol-
lowing points:
– electrical section: cable connections etc.
– Indicator light
– function of maintenance switch.
Mechanical maintenance indicator
– Pull hose „2“ off air intake pipe and build up a
strong vacuum at the open end (Figure 37).
Red zone „1“ will appear and engage in posi-
tion (Fig. 20).
– After the functional check, release red zone „1“
by pressing reset knob „2“.
Renew any defective components without delay.
6.2.
Renewing fan drive belt, checking
operation of belt monitor
– Remove one machine screw at belt pulley „1“
(Figure 38).
– Press back tensioning pulley „2“ and lock it
with the machine screw provided.
– Unscrew and remove the belt pulley.
– Take off the Poly-V belt.
Note:
If any grooves on the belt pulley have broken off
or are bent, always renew the pulley.
Checking operation of belt monitor
Always check operation of the shutdown device
when the belt is renewed.
– Remove the machine screw to release the pis-
ton with tensioning pulley „1“ (Figure 39).
– Spring pressure will force the piston with ten-
sioning pulley out of the housing.
– Angled lever „2“ rotates downwards and re-
leases shutdown pin „3“.
Important !
Shutdown pin must be forced out by spring
loading or else automatic shutdown will not take
place if the belt breaks.
Installing the fan drive belt
– Push in shutdown pin „1“ (Figure 40).
– Push piston with tensioning pulley „2“ into
housing „3“ and lock with the machine screw.
– Place the Poly-V belt centrally on the fan
pulley and install the tensioning pulley and the
lower belt pulley (Figure 41).
– Retain the belt pulley with one machine screw
„1“ without pushing it fully on to the centering
hub (Figure 42).
23
Summary of Contents for 2 - 4 L 40
Page 1: ...INSTRUCTION BOOK 43340205 ENG 09 02 2 Printed in Germany 33 2 4L40 2 4L41 2 4M40 2 4M41...
Page 16: ...2 M 40 and 2 M 41 without oil pan 2 M 40 2 M 41 with oil pan 3 4 M 40 3 4 M 41 in all cases 15...
Page 32: ...10 11 L3 250 050 145 00 12 1 2 3 4 5 6 13 0 14 L3 1 2 1 3 0 15 3 2 START...
Page 33: ...16 L3 3 1 2 3 17 L3 2 18 19 1 2 L3 63 20 L3 48 1 21 1 L3 78 2...
Page 34: ...22 L3 53 1 23 2 1 L3 28 24 L3 105 25 L3 54 26 L3 79 1 2 27...
Page 35: ...28 1 2 3 4 L3 4 1 6 5 7 29 1 30 L3 60 31 L3 58 3 6 5 4 5 2 1 3 7 32 1 L3 50 33 1 1 L3 62...
Page 37: ...40 L3 68 41 2 1 3 L3 67 42 1 L3 70 43 L3 69 1...