I. Installation
Clearances
•
A CWS must have unobstructed space above and
below the unit for piping connections. 2’
(61cm) clearance on the front is required.
•
A CGS must have unobstructed space above and clearance on the sides for piping and
electrical
connections. 3’ (91cm) clearance on the front is required.
Mounting
•
A CWS must be mounted on a wall. Use appropriate anchors to support the weight of the unit.
•
A CGS must be mounted on the floor and secured to a wall. Use appropriate anchors to
prevent any risk of tipping over.
•
Leveling legs are provided with the CGS. Adjust as necessary.
Piping
•
Comply with local codes for proper piping.
•
Use copper piping or reinforced EPDM hose and use non-ferrous materials.
•
Insulate piping to minimize condensation.
•
Ensure piping is clean and free of flux at solder joints.
•
Connect piping to the unit according to the labels on the connections.
Electrical Power
•
Contact a licensed electrician to perform the electrical installation.
•
Refer to the nameplate label for electrical requirements.
•
Use a dedicated service disconnect switch and circuit breaker or time delay fusing according to
the nameplate.
Filling the Unit
•
With the unit switched off, run fluid from the main cooling source through the unit.