T
+44 (0)1709 377172
F
+44 (0)1709 377173
E
www.harvesthealthcare.co.uk
14
15
INSTALLATION
INSTALLING THE DUKE SYSTEM
Remove the mattress from its packaging and lay the parts out on the floor.
You should have the following items:
•
Carry bag (holdall)
•
Mattress with feed tubes attached
• Pump
•
Instruction booklet
1
If you intend to keep this mattress system in storage at some
point please retain the packaging. This will lengthen the life of the
mattress.
Prior to installing the mattress, check that there are no protruding/
sharp objects which may puncture the cover or air cells.
Carefully unroll the mattress on to the mattress platform. Ensure that the pipes at
both the head and foot ends are kink free and straight to prevent restriction of air flow.
Ensure that the air tubing to the pump is at the foot of the bed.
2
The straps on the under side of the mattress are used to secure the mattress to the
bed. Secure the straps using the plastic clips around the bed frame and tighten.
Note: Secure the straps to the moving parts of the platform only.
Care must be taken when fixing the mattress to the bed frame.
3
OVERVIEW
Air Filter
Feed Tube Connection
LCD Display
Control Panel
A
B
C
D
E
F
G
H
Location of Fuses
Power Switch
Power Cable
Bed Hooks
PUMP OVERVIEW
A
B
C
D
E
F
G
H