background image

This product is protected by © Copyright

and Design Right Harrod UK Ltd 2003.

Please Note: For safety reasons, It is recommended that two or more people assemble this goal and it should take 1hour per goal.
Identify the product that you have purchased and refer to the correct pack contents.

No
Nut

Assembly Instructions

1

Crossbar and Uprights

- Lay the Crossbar and Uprights on the ground with the slots facing upwards and Slide 3 Square Head Bolts

into to the slots at both ends of the Crossbar, and 2 Square Head Bolts into the end of each Upright. Fit together using ‘L’Plate, washers

and bolts as shown in Fig 1.

Fig 1 Exploded

2

Assemble Sidebars

- Firstly, fit the Flip-Over Wheel supplied to the Side Bar, following separate instructions supplied with the wheel

position as shown in Fig 2. Fit other parts as shown and the other 2 Plates being hand tight only. Tighten one of the Nuts on the plate

with 4 holes so that the Plate doesn’t move.

21

23

14

20

17

1

2

Assembled Corner Detail

Whole Goal

660

Fig 2 Exploded

Assembled Sideframe

15

22

Pre-fitted

9

20

16

Hand
Tight

Fully tighten 1 only

21

23

Code:

Product:

FBL-635 and FBL-637

3G Aluminium Weighted Portagoal

Reviews: