background image

This product is protected by © Copyright

and Design Right Harrod UK Ltd 2003.

Assembled Corner Detail

Whole Goal

19

Assembled Corner Detail

Whole Goal

Fig 4 Exploded

Assembled Detail

Whole Goal

Fig 5 Exploded

23

21

4

5

23

21

22

23

Tip for fitting Net:

You may either fit the net when

the whole goal is complete or start fitting the net to
the Crossbar and Uprights at this stage to avoid using
step ladders later. For guidance on net hook spacing,
see notes on last page titled, Fitting The Net.

3

Fit Sidebars Important

-

: This next step must be done by 2 competent adults. Lift the Side Bar on to the Upright and slide down over

the exposed plate as shown in Fig 3. Loosen the tight bolt on the plate and slide the plate assembly over the joint. Tighten all bolts to

secure the joint. Keep supporting the Side Bar and carry out step 4&5 before assembling other Side Bar.

Fig 3 Exploded

4

Attach the Net Supports

- Position and fit the Net Support to the unused bolt on the corner joint. fit the Brace ensuring that the Net

Support is square before tightening the Bolts.

5

Attach the Net Supports

- Fit the other end of the net support to the unused Bolt on the Side Bar. Hand tighten only, these can be

secured later, when the goal has been lifted into the upright position. Repeat from step 3 for other Net Support.

3

2

Code:

Product:

FBL-635 and FBL-637

3G Aluminium Weighted Portagoal

Reviews: