5-36
888-2595-001
12/20/11
WARNING: Disconnect primary power prior to servicing.
Section 5 Maintenance and Alignments
ZX Series
Figure 5-5 Output assembly opened for servicing.
Tools required:
8mm nut driver (7/16)
SMA nut driver
STEP 1
Switch transmitter off.
STEP 2
Remove AC mains power.
STEP 3
Open transmitter rear door with hex key provided behind front door.
STEP 4
Disconnect BNC coax cables from PA backplane boards to output
assembly.
STEP 5
Loosed hose clamp at transmitter RF output and break transmission line.
STEP 6
Disconnect 20 pin ribbon cable to 16X load board. Connector may be
found on bottom deck of assembly just behind main RF output and
coupler section.
STEP 7
Disconnect mini-coax cables to forward monitor, reverse monitor,
forward meter, and reverse meter coupling ports (four cables).
[102]
[103]
[101]
[101] Combiner with combiner support
frame.
[102] Heat sink base with 16X load board.
[103] Ballast load.
Summary of Contents for ZX2500
Page 2: ...ii 888 2595 001 12 20 11 WARNING Disconnect primary power prior to servicing...
Page 4: ...iv 888 2595 001 12 20 11 WARNING Disconnect primary power prior to servicing...
Page 6: ...MRH 2 888 2595 001 12 20 11 WARNING Disconnect primary power prior to servicing...
Page 8: ...viii 888 2595 001 12 20 11 WARNING Disconnect primary power prior to servicing...
Page 9: ...12 20 11 888 2595 001 ix WARNING Disconnect primary power prior to servicing...
Page 10: ...x 888 2595 001 12 20 11 WARNING Disconnect primary power prior to servicing...
Page 14: ...xiv 888 2595 001 12 20 11 WARNING Disconnect primary power prior to servicing...
Page 18: ...Table of Contents Continued 4...