background image

 13 

 

Operating Instructions for the  

Thermoelectric Generator (TEG) 

In the event of a failure of the TEG, the LED light and/or fan will not run. The TEG 
should be replaced by following the below instructions before the fire is used again. 

1. Remove side panels by pulling 

the top out of the clips 

2. Remove rear panel by pulling 

out the of the clips 

3. Remove back section of the duct 

by undoing screws 

5. Remove the top and bottom fire 

bricks followed by the rear air 

tube. The rear airtube is held in by 

2 pins, remove and slide out. 

Once removed, this exposes 3 hex 

nuts. Undo these and the TEG will 

be released 

6. The TEG is now released, re-

place entire unit including the con-

trol box. Reverse these steps. 

4. Unscrew control box from the 

side once side panel has been re-

moved. 

Summary of Contents for FERVA CORSAIR

Page 1: ...Email sales hhf co nz Proudly Manufactured By P O Box 4043 Christchurch 8140 New Zealand Phone 03 366 1796 Freephone 0800 3661796 Fax 03 366 1795 CORSAIR Specifications Installation and Operating Inst...

Page 2: ...ation Instructions 6 Operation Instructions Wood 7 8 Caring for your Fire 9 Consumables 10 Creosote Formation 10 Storage of Fuel 11 Useful Tips 11 TEG Operating Instructions 12 Trouble Shooting 13 14...

Page 3: ...3 Dimensions...

Page 4: ...tallation Clearances to COMBUSTIBLE Materials Important Information Clearances are with the 900mm high factory flue shield fitted Minimum floor protector material is 8mm tiles or thermal equivalent Di...

Page 5: ...protector using the provided holes or brackets The re straints should be sufficient enough to resist a seismic loading equal to 0 4 times the mass of the appliance We recommend a minimum of 8mm dynab...

Page 6: ...s and cut away the ceiling materials from the inside of this frame Lower the 300mm flue pipe casing into this frame and nail in place when the bottom edge is 25mm below the ceiling level and the 8 nai...

Page 7: ...7 HeatSaver Flue Kit Installation...

Page 8: ...es visible red hot adjust the heat control to a lower heat position to avoid being unneces sarily harsh on the unit as well as wasting excessive heat up the flue Warning always open the heat control b...

Page 9: ...heck your fire visually several times a year for damaged compo nents Caring for your Fire Cleaning your Glass Wiping your glass regularly with a damp cloth when cold will keep the glass clean If a thi...

Page 10: ...g season to determine if a creosote build up has occurred If this is the case it should be removed by a chimney sweep to reduce the risk of an unexpected flue fire Your appliance has been designed to...

Page 11: ...Use a moisture meter to determine the moisture con tent of the wood Use a soft wood Soft woods like Radiata Pine burn fast and hot Tips for increasing the burn time Shut down the air slide to decrease...

Page 12: ...l The LED light will come on some time before the fan has started The fan may run for some time after the fire has gone out Your TEG does not require any maintenance but the fire will require normal m...

Page 13: ...clips 2 Remove rear panel by pulling out the of the clips 3 Remove back section of the duct by undoing screws 5 Remove the top and bottom fire bricks followed by the rear air tube The rear airtube is...

Page 14: ...f elimina tion to remedy the problem Your flue length may be too short Even though it may be of legal length every installa tion is different and you may require an additional length of flue Your flue...

Page 15: ...fles and fire bricks may void the warranty Your FERVA firebox is then covered by a further 9 year warranty against defective materials and workmanship during normal domestic use In the case of a claim...

Reviews: