![Harrington CF4 Owner'S Manual Download Page 21](http://html2.mh-extra.com/html/harrington/cf4/cf4_owners-manual_3981285021.webp)
r-
!
!
t"'"
Assembly Procedures
7. Wind load chain [42] around the load sheave [18] so that
the bottom hook side comes to right hand and the end
link of the other side becomes vertical to the load
sheave pocket.
Frame[13]
Load sheave [18]
No load side
Body
B
[11]
Welded
Part
Load chain [42]
To bottom
hook
\
8. Put chain guide
[20]
(or guide rollers for 1/2 ton [20-A])
on the frame [13].
t
9. Put stripper
[21]
on the frame [13].
10. Insert pinion [14] shaft from its gear side through the
frame [13] and into ball bearing 8 [16].
11. Insert top pin [3] into the frame [13] and put top hook [1]
to the top pin.
Pinion [14]
Chain guide [20]
Load chain [42]
t
No load side
\
To bottom
hook
21
Top pin [3]
Load sheave [18]
Stripper
[21 ]
Remarks
~
Put the welded part of the
vertical chain link outward.
~
Fit the larger boss of chain
guide [20] into holes on
frame [13].