34
Figure 6-12 Tail Pin Install
6.5.11 Install the tap socket bolt [41] into body B [11] and tighten by hand until the surfaces of the tap bolt and
body B are firmly mated.
6.5.12 Install bottom hook
For Single Fall Hoists
a. Insert the last link of chain on the left side of the load sheave into the bottom hook yoke.
b. Insert the chain pin into the bottom hook yoke and attach castle nut hand tight.
c. Install NEW split pin in castle nut (loosen nut slightly if necessary to align slots in nut with hole
in chain pin.
:
NEVER
forget to bend the split pin after inserting into the castle nut.
For Double Fall Hoists
a. Feed a piece of small diameter mechanics type wire through the bottom hook block around the
idle sheave.
b. Make sure there are no twists in the load chain and attach the load chain to the wire in the
bottom hook block.
c. Feed the chain into the bottom hook block, making sure that the welds are facing the idle
sheave. Refer to Figure 6-13.
d. Remove wire from the chain and insert the end link of chain into the top hook block.
e. Install chain pin, castle nut, and split pin.
:
NEVER
forget to bend the split pin after inserting into the castle nut.
Summary of Contents for CF005
Page 41: ...41 This Page Intentionally Left Blank...
Page 43: ...43 9 1 1 2 to 5 Parts Figure 9 2 1 2 to 5 Ton Parts...
Page 49: ...49 NOTES...
Page 50: ...50 NOTES...
Page 51: ...51 NOTES...