FINISHING CHECKLIST
>Power supply service must be completed prior to finishing to avoid reconstruction.
>Heater vents and air openings can't be covered in any circumstances.
FINISHING CHECKLIST
Once the unit has been properly connected to a grounded electrical outlet,it is ready to operate.
Note:Ensure the house circuit breakers for the power supply are turned on.
Main Power Switch:
The Main Power Switch is located on the right side of the unit.Following illustrates the location of the
switch.The "I" indicates ON and "O" indicates OFF.Push the switch to "I" to turn on the unit and the flame
effect.The red LED Indicator will be turned on.
of
f
on
Power ON/OFF
Summary of Contents for BLT-999W-3
Page 6: ...PRODUCT DIMENSIONS...
Page 9: ......