Ramp Run Handrail Assembly                              

 

1.

 

Secure handrails to ramp section with 
the 2” carriage bolt, washer, and 

1/2” 

nut. When possible, install rails with 
ramp lying flat on the ground, but this 
can also be done on an incline. If bolt 
holes do not line up, use an alignment 
tool or bar clamp to assist. It may be 
necessary to temporarily lower a leg, 
secure the rails, and reset the leg.  

 

 

2.

 

Before attaching the next section of rail, you must install 

the connection sleeve into the upper tube on the handrail. 

Slide connection sleeve roughly half way into upper tube 

and secure with provided self-tapping screw. The handrail 

tubing is already predrilled for this connection. Using a 

driver guide while installing the #2 

screws is highly recommended for 

speed and safety.  

 

3.

 

With connection sleeve installed, you 

can now mount the second handrail. 

Slide second handrail into connection 

sleeve and then rotate down and 

align with bolt holes.  

 

4.

 

Install second self-tapping screw into the opposite side of each connection 

sleeve. Use predrilled hole in upper tube of handrail. Each rail joint should 

have one connection sleeve and two screws. 

 
 

04OCT19  | 630-00103-01 Rev B

Summary of Contents for MODRAMP

Page 1: ...ELEVATION RAMP INSTALLATION MANUAL 04OCT19 630 00103 01 Rev B...

Page 2: ...ear long pants with appropriate footwear that provides toe protection Gloves should always be worn when handling the equipment Eye and ear protection should be used whenever cutting or drilling metal...

Page 3: ...t damages to the modular ramp and its components Harmar will not warrant damages to the Elevation Ramps modular ramping and its components due to the direct or indirect violation of the 850 lb weight...

Page 4: ...4 P a g e Product Speci cation Drawings 04OCT19 630 00103 01 Rev B...

Page 5: ...ng e Harmar components list 2 Verify all site work has been completed in advance 3 Consider if paver stones or a landing pad will be needed 4 Verify all parts components are loaded 5 Verify all tools...

Page 6: ...y on ground near install location Assemble any platforms Assemble any ramp runs Attach ramp runs to landings Assemble handrails Install bottom landing pad if necessary Con rm everything is tight and l...

Page 7: ...ts w ratchet Tape measure 6 48 bubble level Metal cutting saw Metal le and deburring tool Hammer Mallet 36 bar clamp Alignment tool or screw driver Lawn tools shovel rake etc PPE Safety Equipment Tip...

Page 8: ...e height 3 Con rm the height of the platform is appropriate and then level the platform using a 48 bubble level Always level up so that you do not change the overall height of the platform If platform...

Page 9: ...ting structure you must rst mount the J Hook to that structure The top edge of the J Hook should be level with the landing The J Hook must be plumb vertically once securely fastened 4 You are responsi...

Page 10: ...on to appropriate height and tighten both brackets and both legs b Level ramp section from side to side and securely tighten fasteners Leaving one side a bit loose will make sliding in the next ramp s...

Page 11: ...ing the ramp and mounting to the J Hook They can be added once ramp is inclined and self supporting c Install transition plate into bottom groove on the last section of the ramp run Avoid getting dirt...

Page 12: ...er tube on the handrail Slide connection sleeve roughly half way into upper tube and secure with provided self tapping screw The handrail tubing is already predrilled for this connection Using a drive...

Page 13: ...mine orientation The predrilled holes will face down to the ground once installed to the ramp handrail 4 Finish installation by sliding the exposed connection sleeve into ramp handrail While holding t...

Page 14: ...ling a turning platform you must assemble the 90 degree closure kit before mounting both rails Assemble closure kit as shown and secure with provided self tappers Install assembled closure kit into ha...

Page 15: ...t should be matched to that of the other lower rails 4 With adjustable elbows in place installer must measure and cut provided tubing to t tightly between the rails Avoid leaning on either rail when m...

Page 16: ...rom the bottom looking up you can view the pitch of the ramp by siting the upper handrail with your eyes All handrail joints are smooth and there are no sharp edges It may be necessary to le down any...

Reviews: