CHAIR’S WIDTH
,
HEIGHT,
ETC...
HEIGHT,
ETC...
½
WIDTH,
PRIOR TO ANY HOLES BEING DRILLED, IT IS
HIGHLY
RECOMMENDED THAT
THE LIFT BE RUN THROUGH ITS RANGE OF MOTION IN A “TRIAL FIT.”.
WITH THE HELP OF AN ASSISTANT, ASSEMBLE THE LIFT, AND PLACE IT IN THE
MOST REAR CORNER OF THE CARGO SPACE CLOSEST TO THE BUMBER.
(THIS WILL YIELD THE GREATEST AVAILABLE LOADING AREA)
( PASSENGER SIDE SHOWN. DRIVER’S
SIDE IDENTICAL BUT MIRRORED )
THE AlL-055 WILL REQUIRE 3 HOLES TO BE DRILLED
INTO THE VEHICLE, TO BOLT THE LIFT’S BASE TO THE FLOOR.
THE POSITIONING OF THE BASE IS
VERY
IMPORTANT
TO A SUCCESSFUL INSTALLATION AND OPERATION OF THIS LIFT.
ONCE IT HAS BEEN VERIFIED EACH OF THE HELD MEASUREMENTS DOES NOT
INTERFERE WITH THE VEHICLE’S CARGO AREA / OPENING,
MARK THE 3 LOCATIONS IN WHICH TO DRILL
TRIAL FIT PROCEDURE
FOLD THE CHAIR OR SCOOTER’S SEAT BACK ( or REMOVE SEAT ) PREFERABLY
WITH DOCKING DEVICE INSTALLED TO ROUGHLY OBSERVE THE CHAIR’S
TRANSPORTABLE DIMENSIONS.
MEASURE LENGTH, WIDTH, AND HEIGHT
SIMULATE EACH OF THE CHAIR’S DIMENSIONS
( LENGTH, WIDTH, and HEIGHT ) WHILE RUNNING
THE LIFT THROUGH ITS FULL RANGE OF MOTION
IN AND OUT OF THE VEHICLE’S CARGO AREA
WIDTH
LENGTH
HEIGHT
5