Internal
In this section you will determine the function of the eCB1, which in this case, is to be the
metering point at the
house connection
.
Therefore choose “building service head” as device funktion as well.
The button “measurement via current transformer” must only be activated when there is a
measuring transformer needed/installed. Press on the button to activate (orange) and
deactivate (grey). Usually (by German law) a measuring transformer is required when the
house connection exceeds 63A.
To prevent confusion between both, the
eCP1 MP+
and
eCP1 PV
you can choose a name
for the device.
Charge connector
Since the eCB1 MP+ is solely for metering, there is no charging point to define. Choose
“no EVCC”.
Configuration manual
eCB1
Smartmeter
Version: 1.2.1
11