![Hanshen FKR350 Operation Manual Download Page 41](http://html1.mh-extra.com/html/hanshen/fkr350/fkr350_operation-manual_3676782041.webp)
40
3
、
other problem ,abnormity and depose
From other problems and abnormity, out of description “abnormity primary
diagnose ”and “abnormity indicator and depose ”, please check reason as following
sequence and find depose way .Problem and abnoity reason investigation.
First ,classify problem and abnormity
,
look out concerning item as following
1-4.Second
,
confirm which one from right symbol A to D. In order to check
conveniently ,list flow chart from A to D
,
please check according to concerning
content of flow chart
Notice :
abovesaid
【
14
】
and
【
21
】
figures
,
means parts in page
27
、
28
Summary of Contents for FKR350
Page 8: ...7 5 PARTS NAME AND FUNCTION welding power operation front panel...
Page 9: ...8 Welding power...
Page 10: ...9 remote controller...
Page 17: ...16 Preparation before welding operation Install wire...
Page 25: ...24 wire fed machine gas flow meter...
Page 27: ...26 Dimension diagram FKR350 unit mm FKR500 unit mm...
Page 29: ...28...
Page 34: ...33 Daily overhaul continual...
Page 35: ...34 Daily overhaul continua...
Page 36: ...35...
Page 42: ...41...
Page 43: ...42...
Page 44: ...43...
Page 47: ...46 5 Circuit diagram...