14
OPERATION
1
、
Confirmation and preparation before operation
●
Confirming to safety fitting and preparing
●
Safety fittings
●
For your naked eye and skill leather glove and safety boots should be dressed
well.
●
must wear protection mask with shading and filting len.
Avoiding toxin gas(CO, ozone, oxidize nitrogen), ventilation system must be
employed.
●
Check after connection
●
check again and make sure all parts have been connected according to
connecting drawing
Note
Select suitable lens according to current and real situation while CO2 welding is
taken.
Summary of Contents for FKR350
Page 8: ...7 5 PARTS NAME AND FUNCTION welding power operation front panel...
Page 9: ...8 Welding power...
Page 10: ...9 remote controller...
Page 17: ...16 Preparation before welding operation Install wire...
Page 25: ...24 wire fed machine gas flow meter...
Page 27: ...26 Dimension diagram FKR350 unit mm FKR500 unit mm...
Page 29: ...28...
Page 34: ...33 Daily overhaul continual...
Page 35: ...34 Daily overhaul continua...
Page 36: ...35...
Page 42: ...41...
Page 43: ...42...
Page 44: ...43...
Page 47: ...46 5 Circuit diagram...