![Hanshen FKR350 Operation Manual Download Page 18](http://html1.mh-extra.com/html/hanshen/fkr350/fkr350_operation-manual_3676782018.webp)
17
Preparation before welding
■
Slightly move for wire-feed
press spot
①
-switch and wire-feeder
starts, until 15-20mm length of wire
out from nozzle, then loose switch
Note:
Thin wire is easily broken
(
like
Φ
0.8 wire
)
, please slow wire-feed
speed.
)
Note
Select wire roller
,
just according to wire dia. , not wire type.
When using cored wire
,
should adjust pressure of wire-feed arm
,
pressure should be
less than that of solid wire .
In addition, to cored wire, brand and process are different from each other
,
there may
be some difference in demanded pressure ,please note this point.
)
Safety warning
●
For safety
,
after finishing job, all switches including distribution box and welding
power must be turned off
(
auto-switch or circuit breaker and electric leakage
protector
)
●
while slow wire-feeding
,
don't move close to nozzle to see if wire comes out .
●
While welding
,
spatter is dangerous for operator's face and eye.
Summary of Contents for FKR350
Page 8: ...7 5 PARTS NAME AND FUNCTION welding power operation front panel...
Page 9: ...8 Welding power...
Page 10: ...9 remote controller...
Page 17: ...16 Preparation before welding operation Install wire...
Page 25: ...24 wire fed machine gas flow meter...
Page 27: ...26 Dimension diagram FKR350 unit mm FKR500 unit mm...
Page 29: ...28...
Page 34: ...33 Daily overhaul continual...
Page 35: ...34 Daily overhaul continua...
Page 36: ...35...
Page 42: ...41...
Page 43: ...42...
Page 44: ...43...
Page 47: ...46 5 Circuit diagram...