SKUD 18
Owners’ Guide
21
For an external system, the halyard is passed through the spreader fitting (it may be
necessary to grind off some of the inboard end of the port spreader arm) and directly
through the deck eye in the cowling.
The main halyard is a 2:1 system dead-ended at the masthead fitting and reeved inside
the mast and exiting on the starboard side near the foot.
Test Rigging
Before launching the boat for the first time, stand the mast and run all halyards and
control lines to make sure all components have been installed correctly and all functions
are operational.