Valid from: 15.02.2021 / Source: VAM-UM-00551-EN-04
Despite careful checking, we cannot exclude the possibility of errors in this document and we accept no liability for the information it contains.
Page 11
OPERATION
Information about the power meter
WARNING!
Always start with the load valve open.
Power meters are supplied with a closed load valve (1).
The load valve must be fully opened before the test in the hydraulic circuit is initiated.
Turn the load valve handle anticlockwise to open the load valve fully. If the load valve is
not opened fully, this may cause injuries to people and/or damage to the equipment.
Figure 7: Stainless steel power meter, 350 bar Type: HK S TKV Stainless steel
1
Loading valve (load valve)
2
Volume flow meter
3
Thermometer
4
Pressure gauge
5
Burst pressure protection
1
2
5
4
3
Pressure loading unit
Open the load valve
(free flow)
Close the load valve